ESC12-00815
| Aging Inspection | 3/22/2013 | 3/22/2013 | | | |
|
|
|
GCB13-00017
| GCB-Fndatn/slab ins/fld vent | 3/27/2013 | 3/27/2013 | 3/28/2013 8:36:41 AM | P | DONE |
|
|
###-####
|
BLD12-01409
| BLD-Framing/Rough-in | 3/27/2013 | 3/27/2013 | 3/27/2013 3:44:34 PM | P | FAIL |
|
|
Kelly Phone #: ###-#### >> Inspection requested via web by Kelly Stover. NAil off T19 truss girder as per truss engineering, repair hole in lay down soffitt, provide additional treated ply at laydown parapet were missed. Provide adequate bearing under T22 girder truss. Nailoff T17 girder truss as per truss engineering. Still need mech rough in inspection. Correction notice posted.
|
BLD12-01410
| BLD-Framing/Rough-in | 3/27/2013 | 3/27/2013 | 3/27/2013 3:44:03 PM | P | FAIL |
|
|
Kelly Phone #: ###-#### >> Inspection requested via web by Kelly Stover. NAil off T19 truss girder as per truss engineering, repair hole in lay down soffitt, provide additional treated ply at laydown parapet were missed. Provide adequate bearing under T22 girder truss. Nailoff T17 girder truss as per truss engineering. Still need mech rough in inspection. Correction notice posted.
|
BLD12-01410
| BLD-Framing/Rough-in | 3/27/2013 | 3/27/2013 | 3/27/2013 3:40:42 PM | P | CANC |
|
|
Kelly Phone #: ###-#### >> Inspection requested via web by Kelly Stover
|
BLD12-03180
| BLD-Framing/Rough-in | 3/26/2013 | 3/27/2013 | 3/27/2013 2:17:33 PM | P | PART |
|
|
jake Phone #: ###-####. Interior steel steud framed walls ok. Pending electrical rough in inspection.
|
BLD13-00610
| BLD-Footing | 3/26/2013 | 3/27/2013 | 3/27/2013 1:42:08 PM | P | PASS |
|
|
mike Phone #: ###-####
|
ESC13-00255
| Site Preparation | 3/27/2013 | 3/27/2013 | 3/27/2013 1:41:47 PM | P | PASS |
|
|
|
ESC12-01212
| Random Inspection | 3/27/2013 | 3/27/2013 | 3/27/2013 9:16:01 AM | A | PASS |
|
|
|
BLD12-03306
| BLD-Wall Bracing | 3/26/2013 | 3/27/2013 | 3/27/2013 9:15:42 AM | A | PASS |
|
|
Paul Phone #: ###-####
|