Inspections for the day of: Friday, March 27, 2015.
Number of inspections: 27
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Jordan
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD15-00345 BLD-Wall Bracing3/27/20153/27/20153/27/2015 4:12:26 PMPPASS
Nick Phone #: ###-####
BLD15-00107 BLD-Energy code compliance3/26/20153/27/20153/27/2015 4:03:16 PMPPASS
Brett Phone #: ###-####
BLD15-00665 BLD-Final3/27/20153/27/20153/27/2015 3:35:12 PMPPASS
BLD15-00665 DOC - Permit Finaled3/27/20153/27/20153/27/2015 3:34:49 PMPPASS
BLD14-03384 BLD-Framing/Rough-in3/27/20153/27/20153/27/2015 3:25:31 PMPFAIL
Phone #: ###-#### Inspection requested via web by Brian Stark. Box out electrical ground, fire caulk ele. penetrations and complete sheet rock at gable trusses. ok to insulate.
BLD14-03382 BLD-Framing/Rough-in3/27/20153/27/20153/27/2015 3:24:31 PMPFAIL
Please call Brian Phone #: ###-#### Inspection requested via web by Brian Stark. Box out electrical ground, fire caulk ele. penetrations and complete sheet rock at gable trusses. ok to insulate.
BLD15-00665 BLD-Final3/26/20153/27/20153/27/2015 2:44:44 PMACANC
Phone #: ###-#### Inspection requested via web by Naida Khan (This activity was added in error so we have changed the case status back to Issued.).. wrong entry, rescheduled for pm.
BLD14-03157 BLD-Framing/Rough-in3/26/20153/27/20153/27/2015 2:35:55 PMPPASS
Ceclie Phone #: ###-####
BLD14-02997 BLD-Final3/27/20153/27/20153/27/2015 1:40:03 PMPPASS
BLD13-03319 BLD-Energy code compliance3/27/20153/27/20153/27/2015 1:39:11 PMPPASS
Added rockwool insulation to all condensate line penetration into floor assembly. Thanks! Phone #: ###-#### Inspection requested via web by Scott Zierler
BLD15-00389 BLD-Final3/26/20153/27/20153/27/2015 1:15:39 PMPPASS
Tom Phone #: ###-####
BLD15-00389 DOC - Permit Finaled3/27/20153/27/20153/27/2015 1:15:22 PMPPASS
BLD13-03592 BLD-Wall Bracing3/26/20153/27/20153/27/2015 12:09:26 PMAPASS
Second floor. Shear // Tyler Phone #: ###-####
BLD13-03593 BLD-Wall Bracing3/26/20153/27/20153/27/2015 12:08:44 PMAPASS
Second floor. Shear // Tyler Phone #: ###-####
BLD13-03601 BLD-Energy code compliance3/26/20153/27/20153/27/2015 11:00:19 AMAPASS
Insulation// Rob Phone #: ###-####
BLD13-03600 BLD-Energy code compliance3/26/20153/27/20153/27/2015 10:55:36 AMAPASS
Insulation// Rob Phone #: ###-####
BLD13-01766 BLD-Framing/Rough-in3/26/20153/27/20153/27/2015 10:32:07 AMANR
Call 15 mins. before // Joey Phone #: ###-####. Needs electrical rough in inspection.
BLD15-00780 BLD-Final3/25/20153/27/20153/27/2015 10:15:21 AMADONE
Phone #: ###-#### Inspection requested via web by Shelia Gibson
BLD15-00780 DOC - Permit Finaled3/27/20153/27/20153/27/2015 10:15:04 AMPPASS
Alll work appeared to be done in accordance with local codes and ordinances.
BLD15-00665 DOC - Permit Finaled3/27/20153/27/20153/27/2015 10:13:29 AMPPASS
All work appeared to be done in accordance with local codes and ordinances.
BLD15-00711 BLD-Final3/26/20153/27/20153/27/2015 10:12:35 AMAPASS
Final can be done at any time tomorrow. Thanks. Phone #: ###-#### Inspection requested via web by rich prasch
BLD15-00711 DOC - Permit Finaled3/27/20153/27/20153/27/2015 10:12:22 AMPPASS
BLD14-02418 BLD-Framing/Rough-in3/26/20153/27/20153/27/2015 9:57:52 AMAFAIL
Please call ahead for access - Bob Phone #: ###-####. COmplete interior wal bracing, Provide additional truss hangars were missed, nail of all 2 and 3 ply girder trusses, this was completed while on site. Ok to insulate. Squash block at rough sawn lumber.
BLD14-02418 BLD-Wall Bracing3/27/20153/27/20153/27/2015 9:55:54 AMAPASS
Please call ahead for access - Bob Phone #: ###-####
BLD15-00172 BLD-Energy code compliance3/26/20153/27/20153/27/2015 8:48:14 AMAPASS
Brett Phone #: ###-####
BLD15-00172 BLD-Energy code compliance3/26/20153/27/20153/27/2015 8:47:41 AMAPASS
Brett Phone #: ###-####
BLD14-03036 DOC - Permit Finaled3/27/20153/27/20153/27/2015 8:15:19 AMPPASS