ESC15-00035
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 3:43:04 PM | P | PEND |
|
|
1 water truck is on site for both East Valley and Parkcenter. Requested that frequency of application be increased.
|
ESC14-00868
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 3:22:28 PM | | PASS |
|
|
|
ESC14-00950
| Aging Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 2:32:54 PM | | PASS |
|
|
SFH near completion. Needs landscaping and stabilization. No trackout or violations at site.
|
ESC14-00951
| Aging Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 2:32:37 PM | | PASS |
|
|
SFH near completion. Needs landscaping and stabilization. No trackout or violations at site.
|
ESC14-00885
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 2:10:32 PM | | PASS |
|
|
Construction complete on Eckert Greenbelt path. The shoulders/disturbed area has been hydoseeded but is not established yet. Will continue to monitor. No corrections at this time.
|
ESC14-00608
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 1:53:39 PM | | PASS |
|
|
No corrections needed or issues at site. SFH construction has just started in DH#12. BMPs installed.
|
ESC14-00144
| BMP Violation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:34:10 PM | P | PASS |
|
|
Hauling stockpile in previously graded area to Parckcenter roundabout.
No water truck on site for dust control. Conditions areagetting dustier with use and heat. Requested water truck be onsite to wet down haul road ASAP. RP stated water truck was enroute. C & A paving was alson contacted.
|
ESC15-00214
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:09:44 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted. Inlet mats were cleaned as requested for previous site prep requested earlier in week. Washout pit provided, workers to park on street and alley.
|
ESC15-00246
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:08:32 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Approved. 5 Hunter Homes in new DH#12. BMPs installed. Currently approved to use Hunter Homes washout facilitiy in Lucky Harris sub (Harris Crossing) until pit is built for this project.
|
ESC15-00245
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:08:09 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Approved. 5 Hunter Homes in new DH#12. BMPs installed. Currently approved to use Hunter Homes washout facilitiy in Lucky Harris sub (Harris Crossing) until pit is built for this project.
|
ESC15-00244
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:07:36 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Approved. 5 Hunter Homes in new DH#12. BMPs installed. Currently approved to use Hunter Homes washout facilitiy in Lucky Harris sub (Harris Crossing) until pit is built for this project.
|
ESC15-00241
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 1:05:46 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Austin Wagner
Aproved to start new Hunter Homes in DH#12 sub. BMPs installed. Lined washout to provided this afternoon to prevent use of Tahoe Homes desiganted washout so we no who is responsible for clean up.
|
ESC15-00035
| BMP Violation | 3/27/2015 | 3/27/2015 | 3/27/2015 12:57:06 PM | P | FAIL |
|
|
No water truck provided for hauling operation from East Valley subdivision to Parkcenter@ Harris Ranch roundabout road project.
Verbal correction notice issued to Conger management for East Valley dust control and to C & A Paving (hauling loads and building road) for dust control. See also ESC14-00144
|
ESC15-00215
| Site Preparation | 3/27/2015 | 3/27/2015 | 3/27/2015 12:29:20 PM | P | PASS |
|
|
Clint Phone #: ###-####
Permit posted at parcel. East Valley BMPs are in good condition. Lined washout provided for Tahoe Homes. Workers staying off open parcels per orders to prevent trackout.
Approved.
|
ESC13-01323
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 11:37:40 AM | P | PASS |
|
|
Cantabria 4-plex subdivision has vertical construction and road work occuring. Minimal trackout to Cloverdale & Overland. BMPs installed and include MS4 protection, lined concrete washout, designated construction entrances, and perimeter wattles. No fugitive dust at time of inspection.
|
ESC14-00432
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 11:14:45 AM | | PASS |
|
|
WIP on Aralar sub. Streets and sidewalks recently installed. Large Compliance Solutions washout container was used to contain washout.
Silt fence and vegetated buffer are in good condition.
Lazaro Street will need sweeping once the new concrete dries. Drop inlet has filter bag installed that is c tching sediment. After sweeping this bag should be emptied and re-installed.
|
ESC15-00091
| Site Preparation | 3/26/2015 | 3/27/2015 | 3/27/2015 11:02:18 AM | A | PASS |
|
|
Dan Phone #: ###-####
Dunham Commons CBH project next to active SFH. Subdivision BMPs installed and sidewalks and streets are relatively dirt free. Trash containers provided.
1 correction request: Concrete washout full 70%. New lined pit should be dug or this one allowed to dry/evaporate and remove & replace. Approved.
|
ESC13-01159
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 10:13:51 AM | | PASS |
|
|
Peppermill sub in good condition. Drop inlets protected, lined washout pit being utilized. No trackout to Hollandale or nonstormwater discharges observed.
|
ESC13-01006
| General Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 9:45:03 AM | | PASS |
|
|
|
ESC14-00968
| Aging Inspection | 3/27/2015 | 3/27/2015 | 3/27/2015 9:25:33 AM | | PASS |
|
|
Work on pool and landscaping project was deactivated in winter but was recently restarted.
Permit is posted on fence, area of work is in back yard. Permission was granted to access backyard via the open land to the south of the home - if vegetation is disturbed at end of project, some hydroseeding may be required.
|