Inspections for the day of: Tuesday, March 27, 2018.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-03023 FIRE-Conference3/27/20183/27/20183/27/2018 3:29:19 PMPDONE
The Main Stage and the Audio/Visual Stage have both been filled with insulation and now will not require fire sprinkler protection.

Matt Phone #: ###-####
FIR17-00309 INSP-Sprinkler Rough-in3/26/20183/27/20183/27/2018 3:28:16 PMAPART
Installation for the most part is ok. One four way brace at the top of Stair #2 is missing as well as flexible cplgs through a CMU wall. The position of the hose valves in Stair #1 need to be relocated (swung) as per conversation away from the roof drain line as well as possible drainage concerns. It appears the FDC and drain out of the west side of the building interferes with the stairwell door and will need to be relocated.


Todd Ketterling is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR16-00708 INSP-Final Inspection3/21/20183/27/20183/27/2018 2:24:42 PMADONE
Today was a partial inspection. I looked at the control equipment and one first floor wing of the system. I noted that a different FACP panel has been installed, a different communication method has been installed, of the nine NAC panels installled two are different from the rest, all nine are triggered from a single module which is not shown on the plans, the trouble signals are being monitored by two monitor modules that are not shown on the plans, breaker lock is missing, one wall mounted a/v is overspaced as marked on plans, notification needs to be added in the Office with three people in it as marked on the plans. Again this was a partial inspection.

Ray McQueen, inspection technician; building has open availability Phone #: ###-#### Inspection requested via web by Rose Peterson
FIR18-00222 INSP-Final Inspection3/20/20183/27/20183/27/2018 2:19:00 PMAFAIL
Need a 12ah battery as per plans
BLD16-04079 FIRE-Final Inspection3/26/20183/27/20183/27/2018 10:34:34 AMAPASS
life safety passed

Phone #: ###-#### Inspection requested via web by Chris Palmer
FIR17-00303 INSP-Final Inspection3/26/20183/27/20183/27/2018 10:33:21 AMAPASS
permit finaled

Todd Ketterling is the contact for this inspection. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus
FIR17-00584 INSP-Final Inspection3/26/20183/27/20183/27/2018 10:31:56 AMAPASS
Permit finaled

Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
FIR18-00218 INSP-Final Inspection3/26/20183/27/20183/27/2018 8:08:05 AMAFAIL
Called twice, left one message, left project after meeting time was expended

Zach Phone #: ###-#### Inspection requested via web by Don Kartchner
FIR18-00243 INSP-Sprinkler Rough-in3/26/20183/27/20183/27/2018 7:30:31 AMAPASS
Rough-in passed. Piping can be covered.

Rick Phone #: ###-####