FIR18-00804
| INSP-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 5:04:47 PM | P | PART |
|
|
Trip tests for wings A & B were met with satisfactory trip times, wing a time was 45 seconds, wing B was 48 seconds.
Richard Clark is the contact. This final is for wings A ; B. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR18-00804
| INSP-Sprinkler Rough-in/Hydro | 3/26/2019 | 3/27/2019 | 3/27/2019 5:04:46 PM | P | DONE |
|
|
Hydrostatic test for wing C witnessed, system gained 3 pounds during test.
Richard Clark is the contact. This hydro only is for wing C. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00173
| INSP-Final Inspection | 3/27/2019 | 3/27/2019 | 3/27/2019 2:56:35 PM | P | FAIL |
|
|
Performed functionality test on smoke detectors, all tested correctly. Smoke detecto r in multi-purpose room number 7 is oversapced, need to correct spacing issue.
John Howard, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|
BLD17-04626
| FIRE-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 2:04:33 PM | P | CANC |
|
|
FIR permits for fire sprinkler (1 permit for overhead and 1 permit for undergorund) and fire alarm need to be finaled before life fire safety inspection can be completed, this request is cancelled and life fire safety inspection will need to be scheduled to coincide with fire alarm and fire sprinkler inspection.
Fire, Life ; Safety Inspection Phone #: ###-#### Inspection requested via web by J.C. Murray
|
FIR18-00267
| INSP-Sprinkler Rough-in | 3/27/2019 | 3/27/2019 | 3/27/2019 1:49:43 PM | P | PASS |
|
|
Rough to cover inspection for overhead fire sprinkler piping on levels 4 and 5 complete, approved for cover. All rough to cover inspections complete.
Justin Phone #: ###-####
|
FIR18-00267
| INSP-Sprinkler Rough-in/Hydro | 3/27/2019 | 3/27/2019 | 3/27/2019 1:48:48 PM | P | DONE |
|
|
Hydrostatic test for east side standpipe, level 4 and level 5 to include penthouse witnessed, no pressure loss observed.
Justin Phone #: ###-####
|
FIR18-00530
| INSP-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 1:09:06 PM | P | CANC |
|
|
Cancelled per conversation with point of contact, request will be rescheduled by contractor.
Phone #: 2088301311 >> Inspection requested via mobile web by Nathan Price
|
FIR19-00170
| INSP-Sprinkler Rough-in | 3/27/2019 | 3/27/2019 | 3/27/2019 12:40:23 PM | P | PASS |
|
|
All tenting for overhead fire sprinkler piping in place at time of inspection, overhead fire sprinkler piping approved for cover. Noted that garage needs to be conditioned, garage needs to be maintained at 40 degrees or above to be code compliant.
Please call Clarence. This is an insulation inspection.
Thank you Phone #: ###-#### Inspection requested via web by Chris Gregory
|
FIR19-00209
| INSP-Sprinkler Rough-in | 3/26/2019 | 3/27/2019 | 3/27/2019 12:18:48 PM | A | PASS |
|
|
Rough in inspection for scope of work complete.
Tom Phone #: ###-####
|
BLD18-01629
| FIRE-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 12:18:47 PM | A | FAIL |
|
|
Access control did not release on general alram.
Larren Phone #: ###-####
|
FIR18-00510
| INSP-Sprinkler Rough-in | 3/26/2019 | 3/27/2019 | 3/27/2019 10:43:42 AM | A | PART |
|
|
Tenting in rooms 513, 514 and 515 complete, approved for cover.
Need tenting inspection on 5th floor and go through all floors to see what chases need sprinklers Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR19-00098
| INSP-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 10:04:23 AM | A | NR |
|
|
Fire sprinklers were not ready for inspection, no restricted orifice provided.
Barnie Phone #: ###-####
|
FIR17-00612
| INSP-Final Inspection | 3/26/2019 | 3/27/2019 | 3/27/2019 10:03:03 AM | A | FAIL |
|
|
Provide restricted orifice at inspectors test. Two dry pendant heads will need to be re-measured and replaced, escutcheon cannot be installed, head is to short. Contractor needs to verify which anti-freeze loops will stay active and which ones will be removed, if anti-freeze loop is abondoned then piping needs to meet requirements in NFPA 13, Chapter 27.
Gabe Garduno is the contact. Thank you for your hard work! Phone #: ###-#### Inspection requested via web by Stan Beus
|
FIR19-00089
| INSP-Final Inspection | 3/25/2019 | 3/27/2019 | 3/27/2019 7:09:03 AM | A | PART |
|
|
Final fire alarm inspection for area of work complete, permit will be partially finaled, as-builts need to be submitted, after as-builts are approved then permit can be finaled.
Fire marshal requested 7am inspection due to tenant. Phone #: ###-#### Inspection requested via web by Brian Richard
|