FIR20-00041
| INSP-Final Inspection | 3/24/2020 | 3/27/2020 | 3/27/2020 4:26:59 PM | P | PART |
|
|
Inspected/tested unoccupied apartments, tested initiating devices in common cooridors as well as sprinkler monitoring, all tested satisfactorily. Audio visual notification tested throughout building with exception to apartments still being repaired, rooms still being repaired were not tested, rooms do have active fire sprinkler protection. Based on inspection and verbal conversation with Todd C. with the Boise Fire Department, fire watch can be lifted. Fire panel is active as well as monitoring, finalization of remaining items to be completed at a later date.
This is an occupied facility and we have been given a window of between 3-4 pm to get this done. This is a partial to get them off fire watch until the final. Phone #: ###-#### Inspection requested via web by Kristin Dolan
|
BLD14-03120
| FIRE-Final Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 2:16:54 PM | P | PASS |
|
|
Final life fire safety inspection for area of work is complete.
|
FIR20-00108
| INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:22:04 PM | P | PART |
|
|
Rough in inspection is complete, no tenting installed at time of inspection, cover is not approved.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00122
| INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:16:57 PM | P | PART |
|
|
Previously noted item has been corrected, no tenting installed at time of inspection, cover is not approved.
Verify missing head has been installed in open Tee Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00128
| INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:06:33 PM | P | PART |
|
|
Rough in inspection is complete, no tenting installed at time of inspection, cover is not approved.
Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00098
| INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 11:58:58 AM | P | PART |
|
|
Missing head has been installed, rough in inspection is complete, no tenting installed at time of inspection, cover is not approved..
Verify missing head in hallway has been installed. Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR20-00109
| INSP-Sprinkler Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 11:57:49 AM | P | PASS |
|
|
Section of piping with sealant has been replaced, all tenting in place at time of inspection, cover is approved, cover sticker has been placed.
verify replacement of section of piping that had caulk on it. Also, tenting inspection. Phone #: ###-#### Inspection requested via web by Jonathan Lee
|
FIR19-00521
| INSP-Final Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 11:16:19 AM | P | PASS |
|
|
Previously noted items have been corrected, final fire sprinkler inspection is complete.
Call James before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
|
FIR19-00911
| INSP-Sprinkler Rough-in/Hydro | 3/26/2020 | 3/27/2020 | 3/27/2020 10:44:26 AM | A | PART |
|
|
Rough in inspection for sections SB and G is complete, a follow up inspection will be required before final for possible obstructions.
randy Phone #: ###-####
|
FIR19-00962
| INSP-Final Inspection | 3/24/2020 | 3/27/2020 | 3/27/2020 9:40:59 AM | A | PASS |
|
|
Final fire alarm inspection for scope of work is complete.
Chris Siewert, Technician Phone #: ###-#### Inspection requested via web by John Siewert
|