BLD20-00399
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:42:44 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD20-00398
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:42:34 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD20-00397
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:42:20 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD20-00357
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:42:06 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Shane Shade
|
BLD19-03460
| BLD-Wall Bracing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:41:53 PM | P | PART |
|
|
Jorge Phone #: ###-####//need to add hot dip galvanized nails to pt//add blocking///add straps on 2nd story//
|
BLD20-00527
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 4:01:47 PM | P | PART |
|
|
call owner ###-####//zoning document shows approved for 2'6" side setback and 12 front//appears to be 3' check when posts are installed/vertical construction begins//may need to rate soffits, nothing on plans for rated soffits, posts//footing depth ok//
|
BLD20-00775
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 3:22:06 PM | P | PART |
|
|
WIP//per plans on rebar//
|
BLD20-00474
| BLD-Foundation | 3/27/2020 | 3/27/2020 | 3/27/2020 3:00:54 PM | P | PART |
|
|
Greg Phone #: ###-####//WIP//
|
BLD20-00474
| BLD-Footing | 3/27/2020 | 3/27/2020 | 3/27/2020 3:00:35 PM | P | PART |
|
|
Call to be let in // Greg Phone #: ###-####//WIP//
|
BLD20-00633
| BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 2:44:46 PM | P | NR |
|
|
ben Phone #: ###-####//not ready//will need to call back in when ready//
|
BLD19-04094
| BLD-Wall Bracing | 3/25/2020 | 3/27/2020 | 3/27/2020 2:18:39 PM | P | FAIL |
|
|
Dan Phone #: ###-#### Inspection requested via web by Daniel Appel//need to add hot dip galvanized nails at PT//nails shear panels marked in red//finish shear panels//add blocks where noted//told him to call back in//
|
BLD20-00137
| BLD-Framing/Rough-in | 3/27/2020 | 3/27/2020 | 3/27/2020 1:33:53 PM | P | PASS |
|
|
Inspection requested via web by James Jackson//ok, need to fix joist above garage, nail girder//ok to insulate//
|
BLD19-02407
| BLD-Energy code compliance | 3/27/2020 | 3/27/2020 | 3/27/2020 1:07:07 PM | P | PART |
|
|
Inspection requested via web by James Jackson//window U values at .34, discussed with Dennis, will run RES CHeck for trade offs to meet code//insulate above FP///
|
BLD19-03229
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:40:11 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03253
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:39:57 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03247
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:39:43 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03248
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:39:28 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03249
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:39:12 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03250
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:38:56 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03251
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:38:39 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
BLD19-03252
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 12:38:17 PM | A | NR |
|
|
Phone #: ###-#### Inspection requested via web by Carl Funk//used as conference with engineer of record and contractor//some engineering will need to be completed and corrections made in framing//need I joist manual for plumbing in Is//need truss engineering//
|
MIS19-00155
| MIS-Aging Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 10:42:22 AM | | PEND |
|
|
|
BLD19-00974
| DOC - Permit Expired | 2/14/2020 | 3/27/2020 | 3/27/2020 10:41:51 AM | P | DONE |
|
|
expired//
|
BLD18-04123
| BLD-Aging Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 10:41:12 AM | | PEND |
|
|
Expires: 05/12/20
|
MIS18-00110
| MIS-Aging Inspection | 3/27/2020 | 3/27/2020 | 3/27/2020 10:40:08 AM | | PEND |
|
|
permit shows issued status, appears to still be under review based on plan reveiwers activity//have had no contact with owner or contractor on the project//
|
BLD19-00534
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 10:31:05 AM | A | PEND |
|
|
Shaftliner cover and 4th floor ok to insulate Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when firecaulk has been done at shaftliner//ok to insualate 4th floor pending other trades inspections//
|
BLD19-00535
| BLD-Framing/Rough-in | 3/26/2020 | 3/27/2020 | 3/27/2020 10:27:24 AM | A | PART |
|
|
Framing inspection at breezeway ceiling to install shaftliner assembly to bottom of trusses Phone #: ###-#### Inspection requested via web by Travis Blackburn//ok when H2.5s are installed//
|
BLD19-04743
| BLD-Energy code compliance | 3/25/2020 | 3/27/2020 | 3/27/2020 10:26:50 AM | A | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Peter Harris
|
BLD19-04296
| BLD-Final | 3/26/2020 | 3/27/2020 | 3/27/2020 9:26:10 AM | A | FAIL |
|
|
willie Phone #: ###-####//Correction notice posted//caulk penetrations at garage wall//remove dust covers from smoke/co detectors//add fall prevention/opening limitaiton devices at windows with sill height less than 24"//post insulation certificate//
|
BLD20-00385
| BLD-Other | 3/26/2020 | 3/27/2020 | 3/27/2020 8:40:19 AM | A | NR |
|
|
New Roof - not including decks, which owner plans to convert to pergola structures this summer. Also new siding.
Please let us know if we should be using a different ''Inspection Type.'' Thank you! Stay Well!! Phone #: ###-#### Inspection requested via web by Gerald Summers/roofing does not appear to be completed/new//please call when new roof has been installed//
|
BLD19-03701
| BLD-Conference | 3/26/2020 | 3/27/2020 | 3/27/2020 8:22:29 AM | A | DONE |
|
|
adam Phone #: ###-####//discussed via phone, front door will be required to be main egress, one step allowed to landing, landing must be 36" in direction of travel and as wide as door//also sent photo of code sections for required egress and landing//
|