PLM95-01896
| INSP - Final | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | A | PASS |
|
|
03/27/96 323 - FINAL OK
|
PLM95-02002
| INSP - Plumbing Rough-in | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | A | CANC |
|
|
03/27/96 323 - INSPECTION CHANGED TO FRIDAY
|
PLM96-00694
| INSP - Sprinkler & Backflow | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | A | PASS |
|
|
03/27/96 323 - SPRINKLER FINAL
|
PLM96-00700
| INSP - Water lines | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | CANC |
|
|
03/28/96 323 - THURS PM ___ THIS WAS CHANGED TO FRIDAY A.M.
|
PLM96-00705
| INSP - Plumbing Rough-in | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 323 - CHOW INSURANCE..SETTING 2 TOILETS, 2 LAVS, AND 1 WATER HE PERMIT REQUIRED PER PERRY PAINE. THIS INSPECTION IS A FINAL NOT A ROUGH-IN
|
PLM96-00708
| INSP - Ground work | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 323 - STRUCTURAL PERMIT #BLD96-0384 GROUND WORK OK
|
PLM96-00710
| INSP - Water softener | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | NH |
|
|
03/28/96 323 - CALL FIRST ###-#### BOB NO ACCESS __ LEFT NOTE
|
PLM96-00479
| INSP - Plumbing Rough-in | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | FAIL |
|
|
03/28/96 323 - 13 FIXTURES ___ CORRECTIONS NEEDED
|
PLM96-00641
| INSP - Sewer line | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 323 - SEWER TAP ___ SEWER LINE FINAL
|
PLM96-00642
| INSP - Sewer line | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 323 - USTICK TOWNSHIP AREA SEWER LINE FINAL
|
PLM96-00644
| INSP - Sewer line | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 323 - SEWER LINE FINAL
|