PLM95-00618
| INSP - Final | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | A | PASS |
|
|
03/27/96 347 - READY AT 10:00 reinspection final o/k correction made 3/28/6 347
|
PLM96-00646
| INSP - Conference | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | A | PART |
|
|
03/27/96 347 - instructed with lots of technical jargon. they're considering very strongly the expertise tise of a paid contractor 3/28/6 347
|
PLM96-00709
| INSP - Water softener | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | NH |
|
|
03/28/96 347 - CALL FIRST ###-#### OR ###-#### EXT213
|
PLM96-00506
| INSP - Water lines | 3/28/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/28/96 347 - w/l o/k 3/28/6 347
|
PLM4046554
| INSP - Final | 3/27/1996 | 3/28/1996 | 3/28/1996 12:00:00 AM | P | PASS |
|
|
03/27/96 347 - THEY WILL BE HOME w/c 1 basin 1 tub 1 final o/k 3/28/6 347
|