BLD02-00160
| BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | CANC |
|
|
fr wally- ###-####. unable to do will recall for am. 3/28/2002 5:32:44 PM
|
BLD02-00118
| BLD-Other | 3/27/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | CANC |
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 18:06:56. Contact: ###-####.
|
BLD01-02612
| BLD-Conference | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PART |
|
|
###-#### larry . . questions on the area separation wall. 3/28/2002 5:14:40 PM
|
MEC02-00841
| Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PART |
|
|
###-####. most all duct will need to be installed after sheetrock . 3/28/2002 4:20:50 PM it is bellow ceiling line. 3/28/2002 4:21:02 PM 3/28/2002 4:33:05 PM
|