BLD02-00303
| BLD-Framing/Rough-in | 3/27/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PART |
|
|
fr ###-####- scott
c/n posted, ok to insulate pending mech sign off 3/28/2002 3:45:53 PM
|
BLD02-00010
| BLD-Other | 3/27/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | NR |
|
|
Scheduled by a contractor via Hello! on 03/27/2002 at 18:09:09. Contact: ###-####.wrong inspection and permit #???? 3/28/2002 2:00:48 PM
|
BLD01-01834
| BLD-Final | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PASS |
|
|
fn insp- clyde- ###-####
|
BLD01-03269
| BLD-Framing/Rough-in | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PASS |
|
|
KIM ###-####
|
BLD02-00485
| BLD-Conference | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PASS |
|
|
for conf dan- ###-#### ext--321 work --call 1st before insp ///conf on frame and fire blocks 3/28/2002 2:40:06 PM
|
MEC01-03026
| Final | 3/28/2002 | 3/28/2002 | 3/28/2002 12:00:00 AM | P | PASS |
|
|
Scheduled by Inspector: 415 On 3/28/2002 3:24:57 PM pass ok per 411 3/28/2002 3:37:50 PM
|