ELE05-00993
| Electrical Rough-In | 3/25/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | A | FAIL |
|
|
###-#### - kim cor. posted called box fill switch bed rm 300.4 (A)(1)&(D), protect panel bus, replace all 2 , 3 gang boxes with broken clamps 3/28/2005 10:13:02 AM
|
ELE05-00741
| Electrical Rough-In | 3/25/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | A | PASS |
|
|
robert ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok needs 34 cuin 2gang box 3/28/2005 9:15:59 AM
|
ELE05-00530
| Final | 3/25/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | A | PASS |
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok 3/28/2005 8:17:19 AM
|
ELE05-00532
| Final | 3/25/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | A | NH |
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles called no access 3/28/2005 8:19:22 AM
|
ELE05-01002
| Final | 3/28/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | P | NR |
|
|
Suite #102; Phone #: ###-#### Internet Inspection Request from: Dana Moyer conference ok needs 2 pole breakers,605.7, install all kick plates, run low voltage in its section, not mixes with high voltage called 3/28/2005 1:27:19 PM
|
ELE05-00994
| Permanent Service | 3/28/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | P | PASS |
|
|
dave; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie p/s o/h rec. ok 3/28/2005 12:14:32 PM
|
ELE05-00922
| Electrical Rough-In | 3/28/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 3/28/2005 at 10:13:53 AM. Contact: ###-####. 300.4 (A)(1)&(D) 3/28/2005 2:36:15 PM
|
ELE05-00532
| Final | 3/28/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | P | PASS |
|
|
darrell; Phone #: ###-#### Internet Inspection Request from: Barbara Moore ok 3/28/2005 12:59:03 PM
|
ELE04-03710
| Final | 3/28/2005 | 3/28/2005 | 3/28/2005 12:00:00 AM | P | PASS |
|
|
paul; Phone #: ###-#### Internet Inspection Request from: Cathy Chiles ok card signed 3/28/2005 1:48:20 PM
|