Inspections for the day of: Tuesday, March 28, 2006.
Number of inspections: 16
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy James
TitleMEC-COM/RES INSPECTOR
Phone #794-9461
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
MEC05-03607 Final3/28/20063/28/20063/28/2006 4:56:11 PMPPASS
Scheduled by a contractor via Hello! on 3/28/2006 at 8:05:37 AM. Contact: ###-####.
MEC05-03707 Final3/28/20063/28/20063/28/2006 4:55:58 PMPPASS
Scheduled by a contractor via Hello! on 3/28/2006 at 8:04:37 AM. Contact: ###-####.
MEC05-03466 Rough-in3/28/20063/28/20063/28/2006 4:38:17 PMPPART
Lloyd ; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
ok to cover, need to remove screen at vent termination and install hard pipe for vent in crawl
MEC06-00903 Conference3/28/20063/28/20063/28/2006 4:16:03 PMPPASS
greg - conference for roughin; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
MEC06-00903 Rough-in3/28/20063/28/20063/28/2006 4:15:48 PMPPASS
greg - conference for roughin; Phone #: ###-#### Internet Inspection Request from: Brandon Sorensen
MEC06-00332 Final3/28/20063/28/20063/28/2006 3:17:10 PMPFAIL
Jack; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
c/n posted on furnace
MEC05-02841 Conference3/27/20063/28/20063/28/2006 2:33:34 PMAPASS
met with Dixie to show her the job, she will take over TI's
MEC05-03860 Final3/28/20063/28/20063/28/2006 2:32:42 PMPPART
temp. occ waiting for ufc units to be installed at floors 1 and 2 per shell and core
MEC05-02841 Final3/28/20063/28/20063/28/2006 2:30:05 PMPPASS
MEC06-00421 Pressure Test3/27/20063/28/20063/28/2006 11:20:45 AMAPASS
Internet Inspection Request from: Andrea Creek
MEC06-00421 Rough-in3/28/20063/28/20063/28/2006 11:20:35 AMAPASS
Internet Inspection Request from: Andrea Creek
MEC06-00798 Pressure Test3/27/20063/28/20063/28/2006 11:20:00 AMAPASS
Mike -- call 1st before insp; need 1/2 hr to get there; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
MEC06-00942 Pressure Test3/27/20063/28/20063/28/2006 10:34:46 AMAFAIL
Please call Marian or James 30 minutes before going out. ; Phone #: ###-#### Internet Inspection Request from: Aaron Alandt
new gas line needs to connect to 3/4" coming from attic
MEC06-00700 Rough-in3/28/20063/28/20063/28/2006 10:04:33 AMAPASS
Scheduled by a contractor via Hello! on 3/28/2006 at 7:02:17 AM. Contact: ###-####.
MEC06-00726 Rough-in3/28/20063/28/20063/28/2006 9:37:36 AMAPASS
Please Call Gary Reeves at ###-#### for access or questions. Thank you Cassi; Phone #: -###-#### x201 Internet Inspection Request from: Jennifer Jenson
MEC06-00910 Rough-in3/27/20063/28/20063/28/2006 9:26:18 AMAPASS
JOB CONTACT IN JIM HENDERSON ###-####; Phone #: ###-#### Internet Inspection Request from: MARGGIE BUSS
60lb test to unit heater