PLM07-00010
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 3:53:39 PM | P | PART |
|
|
Please call Tyler ###-#### 30 minutes prior to inspection. Thanks. Use ###-#### for a backup contact number. Phone #: ###-#### rp on the espresso and flavor burst mechines, one each. pipe t&p to mop sink with an airgap. install 1/2 grate on floor sink at the hand sink.
|
PLM07-00867
| Plumbing Rough-in | 3/28/2007 | 3/28/2007 | 3/28/2007 3:12:21 PM | P | FAIL |
|
|
steve ###-#### airgap water softener drain. move water lines in exterior wall by fireplaces to inside face of the wall and nail plate, both sides. frame around exposed piping on back porch and insulate, provide full bat insulation under tub traps. waste,vent and water systems tests ok.
|
PLM06-03876
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 2:19:42 PM | P | PASS |
|
|
|
PLM07-00239
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 2:16:50 PM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 7:01:40 AM. Contact: ###-####.
|
MEC07-00201
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 2:16:29 PM | P | PASS |
|
|
Any questions, call Rhiannon at ###-#### Phone #: ###-####
|
PLM06-04015
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 2:16:11 PM | P | PASS |
|
|
|
PLM06-04114
| Final | 3/27/2007 | 3/28/2007 | 3/28/2007 2:00:03 PM | P | PASS |
|
|
Phone #: ###-####
|