BLD07-00475
| FIRE-Final Inspection | 3/28/2007 | 3/28/2007 | 3/29/2007 11:42:14 AM | P | PASS |
|
|
Necessary corrections have been verified for completion, life safety finaled.
|
FIR06-00523
| INSP-Alarm Testing | 3/28/2007 | 3/28/2007 | 3/28/2007 5:06:22 PM | P | PART |
|
|
Sprinkler monitoring only tested today, noted addressing at the WF switches in the riser room to correctly identify the system served.
|
FIR06-00101
| INSP-Final Inspection | 3/27/2007 | 3/28/2007 | 3/28/2007 5:03:47 PM | A | FAIL |
|
|
Missing heads in the building storage room, blocked pendent at the first floor east stair landing, missing escutcheons at several locations, painted head in the pool room, missing flex coulpings at the riser, wet head in the cooler at 33 deg. maintained, one head is overspaced at the ADA room, inspection concluded at the first floor due to the number of defficient items found.
|
BLD06-00660
| FIRE-Final Inspection | 3/28/2007 | 3/28/2007 | 3/28/2007 4:53:06 PM | P | NR |
|
|
Need project related fire alarm and sprinkler permit finals prior to BLD life safety inspection.
|
BLD06-02605
| FIRE-Final Inspection | 3/27/2007 | 3/28/2007 | 3/28/2007 2:26:16 PM | A | NR |
|
|
Pending fire alarm work for smoke evac. system.
|
BLD06-00994
| FIRE-Final Inspection | 3/28/2007 | 3/28/2007 | 3/28/2007 1:36:50 PM | P | PASS |
|
|
Fire life safety finaled, inspection passed.
|
FIR05-00536
| INSP-Sprinkler Rough-in/Hydro | 3/27/2007 | 3/28/2007 | 3/28/2007 1:34:33 PM | A | PART |
|
|
Fire sprinklers are approved for cover at the 1st floor chapel and chaplains office, also reinspected 5th floor RR which was missing a head and one hanger at an arm-over above a hard lid.
|
BLD07-00475
| FIRE-Final Inspection | 3/27/2007 | 3/28/2007 | 3/28/2007 11:01:25 AM | A | FAIL |
|
|
Remove the manual thumbturn at the back exit door and provide approved exiting hardware.
|
MIS07-00057
| FIR-Final | 3/27/2007 | 3/28/2007 | 3/28/2007 10:33:08 AM | A | FAIL |
|
|
Need to provide a current annual inspection for the existing fire sprinkler system to be completed by a licensed fire sprinkler contractor, provide one additional PFE for the upstairs office, remove the manual thumbturn on the main entry/exit door.
|
FIR07-00163
| INSP-Sprinkler Rough-in/Hydro | 3/27/2007 | 3/28/2007 | 3/28/2007 10:30:02 AM | A | PART |
|
|
The UG fire supply line stub-in and IBR are approved for cover.
|