ELE07-00851
| Electrical Rough-In | 3/28/2007 | 3/28/2007 | 3/28/2007 4:13:23 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 7:11:58 AM. Contact: ###-####. ok cover walls only anop
|
ELE07-00464
| Electrical Rough-In | 3/28/2007 | 3/28/2007 | 3/28/2007 4:12:25 PM | P | PART |
|
|
Scheduled by a contractor via Hello! on 3/28/2007 at 6:13:35 AM. Contact: ###-####. ok cover walls anop
|
ELE07-01025
| Temporary Service | 3/28/2007 | 3/28/2007 | 3/28/2007 2:51:53 PM | P | PART |
|
|
Joe; Phone #: ###-#### Internet Inspection Request from: Stacie Backus t/s u/g n ok
|
ELE06-03999
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 12:52:16 PM | P | PASS |
|
|
Someone will be there early afternoon if possible to inspect at that time. Phone #: ###-#### x0000 ok final
|
ELE07-00983
| Final | 3/27/2007 | 3/28/2007 | 3/28/2007 10:21:38 AM | A | PASS |
|
|
veronica underground; Phone #: ###-#### Internet Inspection Request from: Stacie Backus ok cover under ground conduit ok final
|
ELE07-01017
| Electrical Rough-In | 3/27/2007 | 3/28/2007 | 3/28/2007 9:58:41 AM | A | PART |
|
|
ryan--- ###-#### ok cover walls only note romex needs to be removed & the low voltage cable needs to be cleaned up. call t/w electrical contractor
|
ELE07-01002
| Final | 3/28/2007 | 3/28/2007 | 3/28/2007 8:50:09 AM | A | PASS |
|
|
p/s o/h n ok
|
ELE07-01002
| Electrical Rough-In | 3/27/2007 | 3/28/2007 | 3/28/2007 8:48:42 AM | A | PASS |
|
|
PAUL Phone #: ###-#### ok cover ri
|