Inspections for the day of: Friday, March 28, 2008.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR06-00540 INSP-Final Inspection3/27/20083/28/20083/28/2008 3:54:47 PMANR
Scheduled by a contractor via Hello! on 3/27/2008 at 3:25:39 PM. Contact: ###-####.
BLD07-03251 FIRE-Final Inspection3/27/20083/28/20083/28/2008 3:54:05 PMAPASS
Fire life safety passed.
FIR08-00112 INSP-Final Inspection3/28/20083/28/20083/28/2008 3:53:13 PMAPASS
Corrections verified for compliance, mag lock relay programming for three access control doors repaired while on site, permit finaled.
BLD07-01878 FIRE-Final Inspection3/28/20083/28/20083/28/2008 1:45:29 PMPFAIL
Final pending project related fire sprinkler permit work, life safety inspection completed okay, good for final when sprinkler modifications are finished.
FIR07-00917 INSP-Final Inspection3/28/20083/28/20083/28/2008 1:35:43 PMPFAIL
Discovered a new room added per building plan modification that is missing sprinkler coverage. Remainder of tenant area is acceptable, agreed to allow NFPA 13 2007 edition exception for the small room rule for openings to adjacent spaces less than 3' without a lintel per discussion with S. Rogers. Final pending the addition of one required sprinkler at the new "ETO Room".
FIR07-00855 INSP-Final Inspection3/27/20083/28/20083/28/2008 1:28:50 PMAPASS
Fire sprinkler permit work final field inspection passed, noted two missing escutcheons at two restrooms to be installed today, also need to provide QR type heads at the riser head box- these items will be verified for completion at the BLD final.
FIR08-00176 INSP-Final Inspection3/27/20083/28/20083/28/2008 1:25:53 PMAPASS
Tenant fire alarm system modifications tested acceptable, permit finaled.
FIR07-01045 FIR-Aging Inspection3/28/20083/28/20083/28/2008 1:20:28 PM DONE
Project construction underway, work in progress, not ready for field inspection at this time.
BLD08-00043 FIRE-Final Inspection3/27/20083/28/20083/28/2008 1:19:18 PMAPASS
Fire life safety inspection completed acceptable.
FIR08-00031 INSP-Final Inspection3/27/20083/28/20083/28/2008 1:18:18 PMAPASS
One defective sprinkler head at an office replaced immediately on site by R. Fry, remainder of fire sprinkler work passed inspection, permit finaled.
FIR08-00113 INSP-Final Inspection3/28/20083/28/20083/28/2008 10:16:57 AMPCANC
final Inspection Phone #: ###-#### x1234 Internet Inspection Request from: Alicia Pauley Inspection cancelled from web by: Alicia Pauley