Inspections for the day of: Friday, March 28, 2008.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorMike Kinnear
TitleELE-INSPECTOR
Phone #794-1379
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE08-00492 Final3/28/20083/28/20083/28/2008 4:59:34 PMPPASS
Scheduled by a contractor via Hello! on 3/28/2008 at 8:43:39 AM. Contact: ###-####. ok final
ELE06-00270 Final3/28/20083/28/20083/28/2008 4:39:47 PMPPASS
ok final
ELE05-04590 Final3/28/20083/28/20083/28/2008 3:15:49 PMPPASS
ok final
ELE08-00752 Temporary Service3/28/20083/28/20083/28/2008 3:08:57 PMPNR
steve Phone #: ###-#### called steve he needs to meet me at job sight to show me what has been done for this temp service. he to recall for monday & call for an appointment.
ELE08-00502 Final3/28/20083/28/20083/28/2008 12:58:03 PMPPASS
Scheduled by a contractor via Hello! on 3/28/2008 at 8:05:44 AM. Contact: ###-####. ok final
ELE08-00645 Electrical Rough-In3/27/20083/28/20083/28/2008 10:45:11 AMAPASS
Scheduled by a contractor via Hello! on 3/27/2008 at 7:03:08 PM. Contact: ###-####. ok cover ceiling only
ELE05-04173 Final3/28/20083/28/20083/28/2008 9:17:16 AMAPASS
ok final
ELE05-04174 Final3/28/20083/28/20083/28/2008 9:12:58 AMACANC
ok final
ELE08-00231 Final3/27/20083/28/20083/28/2008 8:33:49 AMAPASS
banner bank 6th floor, final electrical
please make as early as possible.
Thanks Phone #: ###-#### Internet Inspection Request from: Kathy Macdonald ok final note signed card
ELE05-03358 Final3/28/20083/28/20083/28/2008 7:49:15 AMAPASS
ok final