Inspections for the day of: Friday, March 28, 2008.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorClint A Smith
TitleEROSION CONTROL INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC07-01005 BMP Violation3/27/20083/28/20083/31/2008 8:19:37 AMAPART
Started to complete everything on the correction notice.
CAS#460
ESC08-00176 Tracking Control3/27/20083/28/20083/28/2008 2:21:07 PMAFAIL
Tracking is not cleaned up to meet our standards. Also one of the dams have been removed so a flow of heavy sedimintated water is discharging from the construction area where there is disturbed soil. Could not get ahold of the RP but got ahold of John Porter the water master for this Area. Will re-inspect on Monday the 31st.
CAS
#460
ESC08-00044 Random Inspection3/28/20083/28/20083/28/2008 1:53:41 PMPFAIL
No container for trash debris. Also heavy sediment in the gutter pan and street area. Informed the RP that if a concrete pour is coming up to have a concrete washout pit or a container for them to washout in. Will re-inspect on Monday.
CAS
#460
ESC07-01448 Random Inspection3/28/20083/28/20083/28/2008 1:19:50 PMPFAIL
Left message with RP. Took down a prt of the silt fence to to compacting of pit run. But due to the slope and the weather conditions told him he would need some type of sediment protection. Also to clean up sediment off of entrance to the storage facility to the north of project.
CAS
#460
ESC07-00340 Random Inspection3/28/20083/28/20083/28/2008 10:48:34 AMPPART
Left a message with store manager of REI to contact the general contractor to get in touch with us over pulling the d.i. bags since construction is complete.
CAS
#460
ESC07-01119 Site Preparation3/28/20083/28/20083/28/2008 9:41:46 AMAPART
Discussed with RP over track out onto Eldorado st. Gave him till the end of the day to get tracking cleaned up. Also to re-install construction entrance to the CGP standards. Prior to leaving they had a street sweeper com through. Recommended perimeter access control on project to eliminate track out of project.
CAS
#460
ESC07-01120 Complaint Inspection3/28/20083/28/20083/28/2008 9:41:27 AMAPART
Discussed with RP over track out onto Eldorado st. Gave him till the end of the day to get tracking cleaned up. Also to re-install construction entrance to the CGP standards. Prior to leaving they had a street sweeper com through. Recommended perimeter access control on project to eliminate track out of project.
CAS
#460
ESC07-01121 Complaint Inspection3/28/20083/28/20083/28/2008 9:39:59 AMAPART
Discussed with RP over track out onto Eldorado st. Gave him till the end of the day to get tracking cleaned up. Also to re-install construction entrance to the CGP standards. Prior to leaving they had a street sweeper com through. Recommended perimeter access control on project to eliminate track out of project.
CAS
#460