FIR12-00122
| INSP-Final Inspection | 3/28/2012 | 3/28/2012 | 3/28/2012 3:08:21 PM | P | PASS |
|
|
Permit finaled
|
BLD12-00522
| FIRE-Conference | 3/28/2012 | 3/28/2012 | 3/28/2012 3:05:51 PM | P | DONE |
|
|
The tenant and I discussed door hardware on the three exterior doors with keyed hardware. He is going to discuss with plan review about not using the west side of the building.
|
FIR11-00563
| INSP-Conference | 3/27/2012 | 3/28/2012 | 3/28/2012 2:35:11 PM | A | DONE |
|
|
Mike and I discussed the project.
|
BLD12-00172
| FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 1:35:20 PM | A | FAIL |
|
|
Provide tagged and mounted 2a,10bc fire extinguisher as discussed. Provide access into the fire sprinkler riser room to verify annual inspection of the sprinkler system.
|
BLD11-03058
| FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 11:57:10 AM | A | PASS |
|
|
life safety passed.
|
BLD08-00986
| FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 10:33:43 AM | A | FAIL |
|
|
Provide building address on both sides of the building as discussed, provide no parking signage per review note #4, provide annual inspection for the fire extinguishers, the surface mounted flush bolts need to be removed from all doors. The upper leaf needs to operate in tandum with the lower leaf when operated. See review notes #6 and #8.
|
BLD12-00507
| FIRE-Final Inspection | 3/27/2012 | 3/28/2012 | 3/28/2012 10:22:42 AM | A | PASS |
|
|
life safety passed
|
FIR12-00023
| INSP-Alarm Testing | 3/27/2012 | 3/28/2012 | 3/27/2012 3:04:28 PM | A | CANC |
|
|
We can meet at the loading dock on the west end of bldg6. Earlier in the morning the better. Thanks Phone #: ###-#### >> Inspection requested via web by Clint Tate Inspection cancelled from web by: Clint Tate
|
BLD08-00870
| FIRE-Conference | 3/14/2012 | 3/28/2012 | | A | |
|
|
Please check on this and let Barb @ permit desk know status-want to try to close out permit-Thanks
|