Inspections for the day of: Friday, March 28, 2014.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR13-00639 INSP-Sprinkler Rough-in3/27/20143/28/20143/28/2014 3:22:54 PMPPASS
Mens and womens restroom piping is ok to cover. Also piping under the stair landing is ok to cover.
FIR14-00152 INSP-Sprinkler Rough-in3/28/20143/28/20143/28/2014 3:12:44 PMPPASS
Mens and womens locker/sauna rooms piping is ok to cover. The individual pendant heads in the showers are not installed. Per contractor no separation will be present and the room pendants will provide coverage.
FIR13-00423 INSP-Final Inspection3/28/20143/28/20143/28/2014 2:59:53 PMPPASS
Permit finaled
FIR13-00697 INSP-Final Inspection3/28/20143/28/20143/28/2014 2:44:05 PMPPART
Sprinkler work in the new Patient Wing is complete.
FIR13-00697 INSP-Sprinkler Rough-in3/27/20143/28/20143/28/2014 2:43:14 PMAPASS
Piping in the Cafeteria Area are ok for cover. Piping in the west side of the new addition is ok to cover (see redlined/clouded area) for location.
BLD13-03495 FIRE-Final Inspection3/28/20143/28/20143/28/2014 1:24:18 PMPPASS
life safety passed
FIR14-00165 INSP-Sprinkler Rough-in/Hydro3/27/20143/28/20143/28/2014 10:44:41 AMAPASS
Rough-in inspection passed. Piping can be covered.
FIR14-00125 INSP-Final Inspection3/24/20143/28/20143/28/2014 10:05:46 AMAPASS
Permit finaled. Netcon was 5
BLD13-03495 FIRE-Final Inspection3/27/20143/28/20143/28/2014 9:26:57 AMAFAIL
Repair the FACP, tag and mount the fire extinguisher and provide emergency lighting at the rear exit.