Inspections for the day of: Friday, March 28, 2014.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorAndy J. Long
TitleEROSION INSPECTOR
Phone #794-8996
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ESC12-00539 General Inspection3/28/20143/28/20143/28/2014 11:58:20 AM PART
Area to the east of Old Hickory is still being used for stockpiling. Area is mostly occupied by Hunter Homes and Tahoe Homes, who are responsible for BMP maintenance and sweeping.

Hunter homes RP in process of emptying washout and providing new lining. Sweeping will be done this weekend.

No major issues, just general housekeeping.
ESC13-00972 General Inspection3/28/20143/28/20143/28/2014 11:55:49 AM PASS
WIP. Permits posted. Alley, streets, and sidewalks are relatively clean. A lot of houses being built on same block. No corrections.
ESC13-00689 Aging Inspection3/28/20143/28/20143/28/2014 11:46:26 AM PASS
Finaled.
ESC13-00689 DOC - Permit Finaled3/28/20143/28/20143/28/2014 11:43:34 AMPPASS
House complete and landscaped. BLD permits finaled. Mill District Square houses still in progess so BMPs will remain installed and area will be inspected. Permit conditions satisfied.
ESC13-00755 Tracking Control3/28/20143/28/20143/28/2014 11:05:42 AMPFAIL
Corrections required:

1. Sweep roundabout at main construction entrance and all the way to Warm Springs
2.. Sweep in front of western construction access
3. Restore construction entrances with rock
4. Provide alternate wheel wash area to prevent pooling at entrance.
ESC13-00979 General Inspection3/28/20143/28/20143/28/2014 10:41:56 AM PART
Corrections for Triplett Ranch:

1. Restore access to concrete washout
2. Install construction entrance to stockpile area in the center; or increase sweep out. Some track out is almost to the main road.

Verbal CN issued to RP Clint via phone. Will follow up next week.
ESC13-01005 Site Preparation3/27/20143/28/20143/28/2014 10:38:41 AMAPART
Clint Phone #: ###-####

Duplicate site prep request. Site prep completed 3/21.

Correction:
1. More rock for washout access
2. Construction entrance to stockpile area or increased sweeping.
ESC13-00870 General Inspection3/28/20143/28/20143/28/2014 9:36:51 AM PASS
ESC13-00855 General Inspection3/28/20143/28/20143/28/2014 9:17:15 AM PASS
ESC13-00879 General Inspection3/28/20143/28/20143/28/2014 8:58:21 AM PASS
WIP. Road construction project on Boise Ave is ongoing so front yard and driveway are messy. Rear silt fence is installed. No corrections at this time.