PLM16-01063
| Plumbing Rough-in | 3/28/2016 | 3/28/2016 | 3/28/2016 11:49:54 AM | A | PASS |
|
|
ri ok
|
PLM16-00533
| Plumbing Rough-in | 3/25/2016 | 3/28/2016 | 3/28/2016 11:40:37 AM | A | PART |
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER dwv and water to soda station on the outside wall test ok
|
PLM15-01450
| Plumbing Rough-in | 3/25/2016 | 3/28/2016 | 3/28/2016 11:39:28 AM | A | PART |
|
|
MARC IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER 9th floor lavs and drinking fountain tests ok
|
PLM16-01063
| Groundwork | 3/25/2016 | 3/28/2016 | 3/28/2016 8:30:26 AM | A | NH |
|
|
would like call ahead; Juan Phone #: ###-#### called left message went by locked up red access sticker on window
|