PLM16-01075
| Water and/or Sewer | 3/28/2016 | 3/28/2016 | 3/28/2016 3:59:03 PM | P | DONE |
|
|
Preliminary on gas line for outside patio. Have a few questions on the old gas line to home. Please call before getting to the property. Access any time after 2 p.m. Phone #: ###-#### Inspection requested via web by Joseph Corcoran >1" gas line to pool htr would need to be 1 1/4" to add bbq and fire pit.
|
PLM16-01054
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 3:29:18 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Roark
|
PLM16-00752
| Plumbing Rough-in | 3/27/2016 | 3/28/2016 | 3/28/2016 2:34:14 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sam Kirk >ri ok >FYI RPBA mounted is 5 foot max
|
PLM16-00920
| Plumbing Rough-in | 3/28/2016 | 3/28/2016 | 3/28/2016 2:15:38 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Samuel Drake >ri ok >wh is existing
|
PLM16-00997
| Plumbing Rough-in | 3/28/2016 | 3/28/2016 | 3/28/2016 2:01:46 PM | P | PASS |
|
|
Gene Phone #: ###-####
|
PLM16-00263
| Final | 3/28/2016 | 3/28/2016 | 3/28/2016 1:34:41 PM | P | PASS |
|
|
Key at tongue of enclosed trailer Phone #: ###-#### Inspection requested via web by Ryan Baker
|
PLM16-01094
| Final | 3/28/2016 | 3/28/2016 | 3/28/2016 1:18:47 PM | P | PASS |
|
|
Joel will be plumber that completes work. Tub shower to shower only conversion. Running test for new shower valve and drain retrofit. Phone #: ###-#### Inspection requested via web by Scott Sparrell >ri trim ok
|
PLM16-00458
| Water and/or Sewer | 3/28/2016 | 3/28/2016 | 3/28/2016 1:16:11 PM | P | PART |
|
|
main water and connection insp. >ok to bury except at 90's
|
PLM15-03911
| PLM-Aging Inspection | 3/28/2016 | 3/28/2016 | 3/28/2016 11:30:24 AM | | PASS |
|
|
work completed
|
PLM15-03911
| DOC - Permit Finaled | 3/28/2016 | 3/28/2016 | 3/28/2016 11:28:44 AM | P | PASS |
|
|
|
PLM15-03719
| Plumbing Rough-in | 3/25/2016 | 3/28/2016 | 3/28/2016 11:26:18 AM | A | PASS |
|
|
DAVID IS THE JOB CONTACT ###-#### Phone #: ###-#### Inspection requested via web by BECCA DUMMER >main bathrooms ri ok
|
PLM16-00959
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 10:03:07 AM | A | PASS |
|
|
>DCVA has been certified
|
PLM16-00958
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 10:02:12 AM | A | PASS |
|
|
>DCVA has been certified
|
PLM16-00956
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 10:01:09 AM | A | PASS |
|
|
>DCVA has been certified
|
PLM16-00957
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 9:59:51 AM | A | PASS |
|
|
>DCVA has been certified
|
PLM16-01089
| Water and/or Sewer | 3/25/2016 | 3/28/2016 | 3/28/2016 9:37:48 AM | A | CANC |
|
|
Phone #: ###-#### Inspection requested via web by James Staley
|
PLM16-01089
| Sprinkler (Final) | 3/28/2016 | 3/28/2016 | 3/28/2016 9:37:24 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by James Staley >need to certify PVB >ok to backfill
|
PLM16-01073
| Water Heater Final | 3/25/2016 | 3/28/2016 | 3/28/2016 9:19:58 AM | A | PASS |
|
|
please contact home owner ( Ron Trout ) ###-#### for inspection Phone #: ###-#### Inspection requested via web by Roy Towers
|
PLM16-01074
| Final | 3/25/2016 | 3/28/2016 | 3/28/2016 9:15:53 AM | A | CANC |
|
|
Please call Rosemary before arrival at ###-####. Thank you! Phone #: ###-#### >> Inspection requested via web by Maira Guzman Inspection cancelled from web by: Maira Guzman
|