Inspections for the day of: Wednesday, March 28, 2018.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorDave Hannah
TitleBLD-COM/RES INSPECTOR
Phone #794-1967
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD17-01451 BLD-Aging Inspection3/28/20183/28/20184/3/2018 6:56:44 AM PEND
BLD17-01450 BLD-Aging Inspection3/28/20183/28/20184/3/2018 6:55:40 AM PEND
BLD17-04644 BLD-Final3/27/20183/28/20183/28/2018 8:57:48 PMPNR
laura opt.2 Phone #: ###-####
BLD17-02428 BLD-Wall Bracing3/28/20183/28/20183/28/2018 8:57:21 PMPNR
Will have approved set of plans onsite. Phone #: ###-#### Inspection requested via web by David Scaggs
BLD17-00583 BLD-Other3/27/20183/28/20183/28/2018 2:06:25 PMAPASS
Exterior wall in meeting room and consult on stairwell wall Phone #: ###-#### Inspection requested via web by David Banks
BLD17-01910 BLD-Footing3/27/20183/28/20183/28/2018 2:06:11 PMPPASS
Waylon Phone #: ###-####
BLD18-00939 BLD-Wall Bracing3/28/20183/28/20183/28/2018 2:05:45 PMPPASS
Shear inspection only. Call Tim if any issues. Phone #: ###-#### Inspection requested via web by Timothy Beaudoin
BLD18-00604 BLD-Energy code compliance3/27/20183/28/20183/28/2018 11:19:19 AMAPASS
Monica Phone #: ###-####
BLD17-03439 BLD-Aging Inspection3/28/20183/28/20183/28/2018 9:52:20 AM DONE
BLD17-03439 BLD-Final3/27/20183/28/20183/28/2018 9:50:36 AMAPEND
Bill-call for access Phone #: ###-#### everything looks good all but for front steps needs a handrail
BLD17-01999 BLD-Ceiling Grid Inspection3/27/20183/28/20183/28/2018 9:05:43 AMAPASS
Brian Phone #: ###-####
BLD17-03955 BLD-Framing/Rough-in3/26/20183/28/20183/28/2018 8:50:15 AMAPASS
Bob Phone #: ###-####
BLD17-03978 BLD-Ceiling Grid Inspection3/27/20183/28/20183/28/2018 8:29:36 AMAPASS
Zack Phone #: ###-#### hard lid
BLD17-04215 BLD-Framing/Rough-in3/27/20183/28/20183/28/2018 8:28:31 AMAPASS
Zack Phone #: ###-####