GRD17-00082
| FIRE-Final Inspection | 3/28/2018 | 3/28/2018 | 3/29/2018 1:38:33 PM | P | FAIL |
|
|
Gate issues. If per the project related BLD permit for the shed, one fire dept acces is required then only one gate (the main one) will be required to have the 20' clear width. If per the plans two access points are required then both gates will need the 20' clearance.
Contacts are either Don Rye ###-#### or Jay Hintze ###-#### - inspection site is at Quality Electric location, 5272 W. Irving. Phone #: ###-#### Inspection requested via web by Scott Campbell
|
FIR18-00115
| INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 3:35:04 PM | P | PASS |
|
|
Permit finaled
Brian Phone #: ###-####
|
FIR16-00708
| INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 3:12:44 PM | P | DONE |
|
|
Today we finished the walk thru for the first floor. See the approved plans that have been dated and signed for the specific areas looked at. I noted added horn/strobes and areas where horn/strobes need to be added. Possibly a manual pull station will need to be added in a stairwell. Plan modifications will be needed.
Ray McQueen, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
|
GRD16-00084
| FIRE-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 3:04:29 PM | A | FAIL |
|
|
No city approved plans or small documents on site. No inspection performed.
Phone #: ###-#### Inspection requested via web by Chris Palmer
|
BLD16-04271
| FIRE-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 2:57:27 PM | A | FAIL |
|
|
Need the Grading permit finaled
Phone #: ###-#### Inspection requested via web by Chris Palmer
|
BLD16-04428
| FIRE-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 2:55:56 PM | A | FAIL |
|
|
Need the Grading permit finaled and the fire sprinkler permit finaled.
Phone #: ###-#### Inspection requested via web by Chris Palmer
|
BLD18-00804
| FIRE-Final Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 10:20:45 AM | P | CANC |
|
|
No fire life safety sign off required
Phone #: ###-#### Inspection requested via web by Chris Howell
|
FIR18-00103
| INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 10:18:33 AM | A | PASS |
|
|
Permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00123
| INSP-Sprinkler Rough-in | 3/27/2018 | 3/28/2018 | 3/28/2018 10:09:41 AM | A | PART |
|
|
Piping as installed is ok and piping can be covered except around heads due to the plans indicating that all heads are fast responce. Only one of the new pendants is fast responce all others are standard responce. Heads need to match plans or modify plans to match install.
Phone #: ###-#### Inspection requested via web by Connie Danes
|
FIR18-00113
| INSP-Final Inspection | 3/27/2018 | 3/28/2018 | 3/28/2018 8:09:16 AM | A | PASS |
|
|
permit finaled
Phone #: ###-#### Inspection requested via web by Sam Ball
|
FIR18-00222
| INSP-Final Inspection | 3/28/2018 | 3/28/2018 | 3/28/2018 7:34:28 AM | P | PASS |
|
|
permit finaled
|