PLM95-01713
| INSP - Plumbing Rough-in | 3/28/1996 | 3/29/1996 | 3/30/1996 12:00:00 AM | A | PASS |
|
|
ROUGH IN ON 3RD AND 4TH FLOOR.
|
PLM95-00410
| INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - final o/k 3/29/6 347
|
PLM95-01713
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | FAIL |
|
|
/ / 347 - DRAIN TEST FAILED 3/29/6 347
|
PLM95-01713
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - CORE AND SHELL ROUGH IN FINAL PASS
|
PLM96-00446
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - R/I O/K W/C 1 BASIN 1 TUB 1 W/B 1 W/H 1 K/S 1
|
PLM96-00506
| INSP - Sewer line | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - SEWERLINE O/K 3/29/6 347
|
PLM96-00579
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PART |
|
|
/ / 347 - CONFERENCE DISCUSSED AND INSTRUCTED INSTALLATION PROCEDURES 3/29/6 347
|
PLM96-00604
| INSP - Sprinkler & Backflow | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | PASS |
|
|
/ / 347 - SRINKLER 0/K 3/29/6 347
|
PLM96-00711
| INSP - Sewer line | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | | NR |
|
|
/ / 347 - SEWER NOT READY 3/29/6 347
|
PLM96-00711
| INSP - Sewer line | 3/28/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | A | NR |
|
|
03/29/96 347 - NOT READY AGAIN 3/29/6
|
PLM96-00715
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | P | PASS |
|
|
03/29/96 347 - 9 FIXTURES W/C 2 BASIN 2 TUB 2 SINK 1 W/B 1 W/H 1 R/I O/K 3/29/6 347
|
PLM96-00721
| INSP - Water lines | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | P | PASS |
|
|
03/29/96 347 - READY AT 3:00 waterline ok 3/29/6 347 ì
|
PLM96-00672
| INSP - Plumbing Rough-in | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | P | FAIL |
|
|
03/29/96 347 - ROUGH IN FAILED DRAIN TEST REINSPECTION FEE 20.00
|
PLM96-00384
| INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | P | PASS |
|
|
03/29/96 347 - W/C 2 BASIN 3 TUB 1 SHR 2 SINK 1 W/B 1 W/H 1 W/S 1 FINAL O/K 3/29/6 347
|
PLM96-00446
| INSP - Final | 3/29/1996 | 3/29/1996 | 3/29/1996 12:00:00 AM | P | PASS |
|
|
03/29/96 347 - THERE HAS BEEN A PARTIAL ROUGH IN DONE. HE SAYS IT IS REA FINAL O/K 3/29/6 347 W/C 1 BASIN 1 TUB 1 W/H 1
|