Inspections for the day of: Wednesday, March 29, 2000.
Number of inspections: 12
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorWes Worcester
TitleBLD-COM/RES INSPECTOR
Phone #340-1490
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD00-00337 BLD-Energy code compliance3/28/20003/29/20003/29/2000 12:00:00 AMAPASS
Sean ###-####
BLD00-00243 BLD-Framing/Rough-in3/28/20003/29/20003/29/2000 12:00:00 AMAPASS
###-#### dave
BLD00-00267 BLD-Framing/Rough-in3/28/20003/29/20003/29/2000 12:00:00 AMAFAIL
###-#### Shear panels not installed nor nailed perl engineering- typical 3/29/00 12:04:52 PM
BLD99-03381 BLD-Energy code compliance3/28/20003/29/20003/29/2000 12:00:00 AMAPASS
###-####
BLD00-00133 BLD-Foundation3/28/20003/29/20003/29/2000 12:00:00 AMPPART
###-#### Top 2 rebar in basement walls not in incomplete. 3/30/00 10:55:34 AM
BLD99-00810 BLD-Final3/28/20003/29/20003/29/2000 12:00:00 AMPFAIL
###-#### Need public works still. 3/30/00 10:55:11 AM
BLD00-00073 BLD-Final3/28/20003/29/20003/29/2000 12:00:00 AMPFAIL
Justin Walker ###-#### Need other signatures (fire & sprinklers) 3/30/00 10:55:01 AM
BLD00-00134 BLD-Footing3/29/20003/29/20003/29/2000 12:00:00 AMPPASS
###-#### ext 14236
MEC00-00796 Pressure Test3/29/20003/29/20003/29/2000 12:00:00 AMPPASS
kevin ###-#### CELL ###-####
MEC00-00796 Rough-in3/29/20003/29/20003/29/2000 12:00:00 AMPPASS
KEVIN ###-#### CELL ###-####
MEC00-00820 Rough-in3/29/20003/29/20003/29/2000 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/29/2000 at 10:45:41. Contact: ###-####. Frplc. only- P/T ok also. 3/30/00 10:54:33 AM
BLD00-00593 BLD-Foundation3/29/20003/29/20003/28/2000 12:00:00 AMAPASS
FOUNDATION WALL-JERRY ###-#### TRIED TO USE THE IVR