ELE00-00168
| Final | 3/28/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | A | FAIL |
|
|
###-#### NEC:210-52 (A) Recepticle outlet shall be required within. 6ft. of opening in linear wall. Called contractor. 3/29/00 12:00:40 PM
|
ELE00-00693
| Electrical Rough-In | 3/28/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | A | PART |
|
|
Alex ###-#### East & South walls Ele. R/I 3/29/00 12:01:42 PM
|
ELE99-02469
| Electrical Rough-In | 3/28/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | A | PART |
|
|
###-#### robert Conference: branch circuit code requirements. 3/29/00 12:01:12 PM
|
ELE00-00538
| Final | 3/28/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | A | PASS |
|
|
###-#### Completed 3/29/00 12:01:49 PM
|
ELE99-04436
| Final | 3/28/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | A | PASS |
|
|
###-#### Corrections completed. 3/29/00 12:01:28 PM
|
ELE00-01058
| Temporary Service | 3/29/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Unused opening shall be sealed. Service entrance neutral conductor shall be insulated. 3/30/00 2:16:57 PM
|
ELE00-00599
| Final | 3/29/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | P | PASS |
|
|
pager ###-#### Completed. 3/30/00 2:17:11 PM
|
ELE99-02600
| Final | 3/29/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | P | PASS |
|
|
please call mark ferm at ###-#### Ok. 3/30/00 2:17:04 PM
|
ELE00-00168
| Final | 3/29/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | P | FAIL |
|
|
###-#### Not ready; called contractor. 3/30/00 2:16:28 PM
|
ELE00-00197
| Final | 3/29/2000 | 3/29/2000 | 3/29/2000 12:00:00 AM | P | PART |
|
|
###-#### pager Temp. occ. 3/30/00 2:17:19 PM
|