BLD01-00055
| BLD-Energy code compliance | 3/28/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 09:51:07. Contact: ###-####.
|
BLD00-02725
| BLD-Other | 3/28/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | A | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/28/2001 at 14:15:11. Contact: ###-####. grid needs perimeter wires with-in 8 in of walls. c/n. 3/29/2001 12:21:34 PM
|
BLD01-00550
| BLD-Footing | 3/28/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | A | PASS |
|
|
###-####
|
BLD01-00469
| BLD-Framing/Rough-in | 3/28/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted. 3/29/2001 10:52:08 AM
|
BLD01-00502
| BLD-Framing/Rough-in | 3/28/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | A | FAIL |
|
|
###-####c/n posted 3/29/2001 10:51:57 AM
|
BLD00-03618
| BLD-Foundation | 3/29/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 06:15:01. Contact: ###-####.poured appears ok. 3/29/2001 2:54:51 PM
|
BLD00-03674
| BLD-Wall cover | 3/29/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 08:00:02. Contact: ###-####. all ok except need to complete retro-fit anchor bolts to existing mud sills. 3/29/2001 2:36:23 PM
|
BLD01-00079
| BLD-Framing/Rough-in | 3/29/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | P | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 09:06:22. Contact: .ok to cover need 1 brace at 45 added to the soffit over counter, verifiy at next insp, ceiling not yet in place. 3/29/2001 2:38:29 PM
|
BLD00-03400
| BLD-Final | 3/29/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 10:39:53. Contact: ###-####.need to caulk the exterior wall electrical boxes. 3/29/2001 3:46:47 PM
|
BLD00-03388
| BLD-Framing/Rough-in | 3/29/2001 | 3/29/2001 | 3/29/2001 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/29/2001 at 10:41:02. Contact: ###-####. needs gas test approved and truss over front door needs 1 brace added. 3/29/2001 3:46:02 PM
|