Inspections for the day of: Friday, March 29, 2002.
Number of inspections: 10
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorRuss Owen
TitleBLD-COM/RES INSPECTOR
Phone #794-9473
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD01-00621 BLD-Final3/28/20023/29/20023/29/2002 12:00:00 AMAPASS
fn mike ###-#### -re-insp . ok perm oc. 3/29/2002 2:19:00 PM
BLD01-03230 BLD-Framing/Rough-in3/28/20023/29/20023/29/2002 12:00:00 AMAPART
###-####- steve r/i 2nd floor south side partition ok after ele. 3/29/2002 12:28:21 PM
BLD01-00736 BLD-Framing/Rough-in3/28/20023/29/20023/29/2002 12:00:00 AMAPART
Scheduled by Inspector: 407 On 3/28/2002 3:54:45 PM .pool area ok to sheetrock., Also talked with engineer about kitchen beam with holes , ok as is will be sending letter soon. 3/29/2002 12:02:52 PM
BLD02-00160 BLD-Framing/Rough-in3/28/20023/29/20023/29/2002 12:00:00 AMAFAIL
Scheduled by Inspector: 407 On 3/28/2002 5:31:00 PM . no plans .c/n 3/29/2002 12:00:08 PM
MEC02-00805 Rough-in3/29/20023/29/20023/29/2002 12:00:00 AMAPASS
Scheduled by Inspector: 407 On 3/29/2002 10:17:57 AM
MEC02-00805 Pressure Test3/29/20023/29/20023/29/2002 12:00:00 AMAPASS
Scheduled by Inspector: 407 On 3/29/2002 10:18:17 AM
BLD01-00737 BLD-Framing/Rough-in3/29/20023/29/20023/29/2002 12:00:00 AMAPART
Scheduled by Inspector: 407 On 3/29/2002 12:03:22 PM
BLD02-00588 BLD-Conference3/29/20023/29/20023/29/2002 12:00:00 AMPPART
Scheduled by Inspector: 407 On 3/29/2002 3:05:46 PM Issued 5 day notice to Manager . 3/29/2002 3:55:54 PM
BLD01-02902 BLD-Final3/29/20023/29/20023/29/2002 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 03/29/2002 at 08:25:10. Contact: ###-####.
BLD01-02207 BLD-Foundation3/27/20023/29/20023/29/2002 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 03/27/2002 at 07:48:28. Contact: ###-####.poured appears ok. 3/29/2002 4:21:28 PM