BLD02-00548
| BLD-Foundation | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 07:23:15. Contact: ###-####. wip 3/29/2002 9:29:08 AM
|
BLD02-00034
| BLD-Final | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
fn -patty cell ###-#### -door bell does not work call cell # if needed-will be there
|
BLD02-00447
| BLD-Framing/Rough-in | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | FAIL |
|
|
william- ###-#### -shear c/n--nails fracture surface of osb excessively. 3/29/2002 10:13:37 AM
|
BLD01-03179
| BLD-Final | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | FAIL |
|
|
###-#### garage code 9876 enter c/n posted 3/29/2002 10:00:38 AM
|
BLD02-00114
| BLD-Energy code compliance | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 07:16:55. Contact: .
|
BLD02-00249
| BLD-Framing/Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PART |
|
|
Scheduled by a contractor via Hello! on 03/29/2002 at 07:19:11. Contact: (208) 3/29/2002 11:00:14 AM ok to insulate 3/29/2002 11:00:25 AM
|
BLD01-02374
| BLD-Final | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
###-####--lock box code is 193 c. of c. #22177 issued. 3/29/2002 8:31:36 AM
|
BLD01-02318
| BLD-Final | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | FAIL |
|
|
###-####--lock box code is 193 c/n issued--tempered glass needed in both bathrooms with windows--within 5' of standing surface of tub/shower 3/29/2002 9:00:01 AM
|
BLD02-00050
| BLD-Energy code compliance | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | FAIL |
|
|
Scheduled by a contractor via Hello! on 03/28/2002 at 16:04:16. Contact: ###-####. c/n posted--Contractor to completed insulation and vapor barrier--call for re-inspection. 3/29/2002 1:29:53 PM
|
BLD02-00269
| BLD-Foundation | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | CANC |
|
|
###-#### NEIL Will re-schedule for monday. 4/1/2002 7:56:12 AM
|
BLD02-00153
| BLD-Framing/Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PART |
|
|
terry ###-#### fr c/n posted--ok to insulate 3/29/2002 2:58:08 PM
|
BLD02-00447
| BLD-Framing/Rough-in | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PASS |
|
|
shear wall bill- ###-#### SHEAR--ok to side. 3/29/2002 1:56:21 PM
|
BLD02-00508
| BLD-Footing | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PART |
|
|
###-#### dirk wip--20% ready at time of inspection. 3/29/2002 2:27:22 PM
|
BLD02-00168
| BLD-Energy code compliance | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PASS |
|
|
###-####- bruce installation
|
BLD02-00406
| BLD-Framing/Rough-in | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | CANC |
|
|
###-#### ###-#### tom
|