FIR01-00396
| INSP-Sprinkler Rough-in/Hydro | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
4th floor hydro test OK, OK to cover pool area and small south side dry system 3/29/2002 3:04:14 PM
|
BLD01-00871
| FIRE-Final Inspection | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
fire life/safety finaled 3/29/2002 11:47:06 AM
|
FIR02-00055
| INSP-Final Inspection | 3/28/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | A | PASS |
|
|
Fire sprinkler system finaled 3/29/2002 9:57:00 AM
|
BLD01-03069
| FIRE-Final Inspection | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PART |
|
|
Fire life/safety and fire sprinkler OK. Per Dave Miller I signed a temp on this permit and the MIS02-00066 until the fire alarm system is approved and finaled. 3/29/2002 2:17:53 PM
|
MIS02-00066
| FIR-Final | 3/29/2002 | 3/29/2002 | 3/29/2002 12:00:00 AM | P | PART |
|
|
Fire life/safety and fire sprinkler OK. Per Dave Miller I signed a temp on this permit and the vanilla finish until the fire alarm system is approved and finaled.
|