Inspections for the day of: Monday, March 29, 2004.
Number of inspections: 15
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorPat Lass
TitleELE-INSPECTOR
Phone #794-9478
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE03-00600 ELE-Aging Inspection3/29/20043/29/20043/29/2004 12:00:00 AM NR
suc 3/30/2004 7:36:23 AM
ELE03-00603 ELE-Aging Inspection3/29/20043/29/20043/29/2004 12:00:00 AM NR
suc 3/31/2004 10:19:57 AM
ELE03-00604 ELE-Aging Inspection3/29/20043/29/20043/29/2004 12:00:00 AM NR
suc 3/31/2004 10:20:01 AM
ELE04-00840 Temporary Service3/26/20043/29/20043/29/2004 12:00:00 AMAPASS
###-#### casey
T/S U/G Ok 3/29/2004 10:22:23 AM
ELE04-00815 Electrical Rough-In3/26/20043/29/20043/29/2004 12:00:00 AMAPART
Phone #: ###-#### Internet Inspection Request from: Shelli Daylong
Underground pipe from garage to house ok 3/29/2004 10:06:34 AM
ELE04-00031 Final3/26/20043/29/20043/29/2004 12:00:00 AMAPASS
emmett; Phone #: ###-#### Internet Inspection Request from: Barbara Moore
ELE03-03834 Final3/26/20043/29/20043/29/2004 12:00:00 AMAFAIL
###-####. Scheduled by a contractor via Hello! on 3/26/2004 at 3:10:40 PM. Contact: ###-####. 3/29/2004 7:39:12 AM
recep required within 25 ft. of new hvac unit on roof. 3/29/2004 11:09:20 AM
ELE03-02636 Final3/26/20043/29/20043/29/2004 12:00:00 AMAFAIL
###-####. Scheduled by a contractor via Hello! on 3/26/2004 at 4:24:39 PM. Contact: ###-####. 3/29/2004 7:38:42 AM
a bathroom has been added to the basement so it is no longer unfinished per approved plans.
finish wiring the basement and bonus room.
install bookcase or recep next to fireplace in family room. 3/29/2004 9:25:40 AM
ELE03-03598 Final3/28/20043/29/20043/29/2004 12:00:00 AMACANC
###-####. Scheduled by a contractor via Hello! on 3/28/2004 at 6:53:45 PM. Contact: ###-####. 3/29/2004 7:38:55 AM
ELE04-00842 Temporary Service3/29/20043/29/20043/29/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/29/2004 at 8:19:02 AM. Contact: ###-####.
equipment is dirty, rusted, and has signs of ovedrheating.
grounds and neutrals are not properly identified.
cover has been modified to accomidate receptacles mounted in it.
strands of wires have been cut or broken off. 3/29/2004 1:56:58 PM
ELE04-00842 Temporary Service3/29/20043/29/20043/29/2004 12:00:00 AMPFAIL
Scheduled by a contractor via Hello! on 3/29/2004 at 8:19:02 AM. Contact: ###-####.
equipment is dirty, rusted, and has signs of ovedrheating.
grounds and neutrals are not properly identified.
cover has been modified to accomidate receptacles mounted in it.
strands of wires have been cut or broken off. 3/29/2004 1:56:58 PM
ELE03-03062 ELE-Request for Extension3/29/20043/29/20043/29/2004 12:00:00 AMPNR
dale; Phone #: ###-#### Internet Inspection Request from: Darla Downs
extend permit 3/29/2004 10:08:32 AM
ELE02-03371 ELE-Request for Extension3/29/20043/29/20043/29/2004 12:00:00 AMPNR
still working on this project ###-#### paul
extended 3/29/2004 11:11:43 AM
ELE03-03598 Final3/29/20043/29/20043/29/2004 12:00:00 AMPCANC
ELE03-03598 Final3/29/20043/29/20043/29/2004 12:00:00 AMPPART
212-213-214-&215 floor box loose.
210 loose recep right of stove.
212 entry lite not working.
214 loose recep to left of back door.
205 &214 recep under 6in + overhang
207 not ready 3/29/2004 4:39:29 PM