Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE05-00985 Electrical Rough-In3/29/20053/29/20053/29/2005 12:00:00 AMAPASS
Call Francis with any questions.@ ###-####; Phone #: ###-#### Internet Inspection Request from: Daniel Gamboa ric ok 3/29/2005 8:01:23 AM
ELE05-00860 Electrical Rough-In3/28/20053/29/20053/29/2005 12:00:00 AMANR
Scheduled by a contractor via Hello! on 3/28/2005 at 11:28:52 AM. Contact: ###-####. met with elect, said they needed more showroom rcpts, and they need to make-up boxes. They are finding out about the access at the front or entrance area. 3/29/2005 9:46:37 AM
ELE04-02834 Electrical Rough-In3/28/20053/29/20053/29/2005 12:00:00 AMAPASS
jodi-- ; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie corrections made, ric ok 3/29/2005 7:33:19 AM
ELE04-04039 Final3/28/20053/29/20053/29/2005 12:00:00 AMAPASS
darrell; Phone #: ###-#### Internet Inspection Request from: Marsha Smylie ok to final 3/29/2005 8:58:17 AM
ELE05-00903 Electrical Rough-In3/28/20053/29/20053/29/2005 12:00:00 AMACANC
dennis ###-#### called in wrong job for inspection 3/29/2005 10:14:49 AM
ELE05-01020 Final3/28/20053/29/20053/29/2005 12:00:00 AMAPASS
We replaced the existing double pole circuit breaker in the outdoor panel with a 20/20 quad breaker,ran a #12-2 romex through the nipple out the back of the panel to the old panel/junction box just inside the back door, fished this romex down the wall into the crawl space under the house and ran it over to a new 20 amp double pole switch as a disconnect and then fed the pressure switch,& from the pressure switch to a new j-box to tie into the existing UF romex going out to the well head. We set a bell box at the well head, sleeved the existing UF romex coming into it and made up connections at the well head.Thanks!!!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell called contr about white wire on breaker. they will fix. ok to final 3/29/2005 8:51:41 AM
ELE05-00407 Final3/28/20053/29/20053/29/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/28/2005 at 3:58:57 PM. Contact: ###-####. called contr about a/c to move about 2" and add screw to gfci in garage. ok to final 3/29/2005 1:42:05 PM
ELE05-00765 Electrical Rough-In3/28/20053/29/20053/29/2005 12:00:00 AMPPART
Scheduled by a contractor via Hello! on 3/28/2005 at 5:19:23 PM. Contact: ###-####. ric not ready, see add on for p/s 3/29/2005 2:48:20 PM
ELE05-00885 Final3/29/20053/29/20053/29/2005 12:00:00 AMPPART
Please inspect 2 short trenches near the silo at the far end of the trench that you had inspected for us last time, so we can cover.THANKS!!!Dan.; Phone #: ###-#### Internet Inspection Request from: Dan Mitchell ok to cover trench only to panels. 3/29/2005 4:29:10 PM
ELE05-00652 Electrical Rough-In3/29/20053/29/20053/29/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/29/2005 at 8:38:51 AM. Contact: ###-####. ok to cover clg. met with elect for a couple of items. 3/29/2005 12:44:52 PM
ELE05-01039 Electrical Rough-In3/29/20053/29/20053/29/2005 12:00:00 AMPPASS
trench inspection ###-#### rex ok to cover trench only 3/29/2005 2:39:03 PM
ELE05-01040 Electrical Rough-In3/29/20053/29/20053/29/2005 12:00:00 AMPFAIL
###-#### - dennis stop work tag from mech on bldg. Called contr and told him that no inspection can be done. 3/29/2005 3:29:43 PM
ELE05-00860 Electrical Rough-In3/29/20053/29/20053/29/2005 12:00:00 AMPPASS
Scheduled by a contractor via Hello! on 3/29/2005 at 9:48:50 AM. Contact: ###-####. ok to cover store front 3/29/2005 12:56:15 PM
ELE05-00435 Final3/29/20053/29/20053/29/2005 12:00:00 AMPPASS
###-#### Tom ok to final 3/29/2005 4:42:52 PM
ELE05-00765 Permanent Service3/29/20053/29/20053/29/2005 12:00:00 AMPPASS
p/s u/g n ok