PLM05-01892
| Other | 3/29/2006 | 3/29/2006 | 3/29/2006 5:09:06 PM | P | PART |
|
|
This will be for a conference with Steve ###-####; Phone #: ###-#### Internet Inspection Request from: Sonja Hankel need a reclaimed water sign for each bathroom door...mens and womens on each floor.....review several items on code and reclaim systems also.....Steve says he should be ready for cross-connection test next week.
|
PLM06-00214
| PLM-Aging Inspection | 3/29/2006 | 3/29/2006 | 3/29/2006 2:28:19 PM | | NR |
|
|
contractor called back.....not ready yet just like I figured this one only took (wasted)12 minutes to no avail.
|
PLM06-00387
| Plumbing Rough-in | 3/28/2006 | 3/29/2006 | 3/29/2006 11:09:24 AM | A | PASS |
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong
|
PLM06-00387
| Other | 3/29/2006 | 3/29/2006 | 3/29/2006 11:09:09 AM | P | PART |
|
|
Craig; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong checked three hvac people for licenses and found one apprentice without. His name is curtis ray with t and t heating. Notified him to get registered with state and had his journeyman call the owner and inform him.
|
PLM06-00859
| Groundwork | 3/29/2006 | 3/29/2006 | 3/29/2006 10:36:12 AM | A | PASS |
|
|
|
PLM06-00859
| Plumbing Rough-in | 3/28/2006 | 3/29/2006 | 3/29/2006 10:32:35 AM | A | PART |
|
|
Kelly -- underground; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong This is a groundwork, not a rough in.
|
PLM06-00184
| PLM-Aging Inspection | 3/29/2006 | 3/29/2006 | 3/29/2006 9:26:32 AM | | NR |
|
|
this took two phone calls and 15 minutes of my time to find out from the contractor that the job was still in progress.
|