Inspections for the day of: Wednesday, March 29, 2006.
Number of inspections: 11
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR05-00898 INSP-Final Inspection3/27/20063/29/20063/29/2006 6:18:46 PMPFAIL
Two in-duct detectors failed to function properly, horn in the charging room does not sound the temporal pattern required for fire alarm and conflicts with the temporal pattern of the horn in the office, need to provide NFPA 72 Inspection and Testing form, a copy of central station signal verification of items tested today including panel, sprinkler monitoring, detection and notification devices, alarms, supervisory, and troubles from 3:50 to 5:00 pm today to be available on site at next inspection for review.
FIR05-00542 INSP-Final Inspection3/29/20063/29/20063/29/2006 6:08:38 PMPPASS
Outstanding items have been completed, fire sprinkler finaled.
BLD04-02348 FIRE-Conference3/28/20063/29/20063/29/2006 3:20:47 PMPDONE
Stair presurization at 2:00pm; Phone #: ###-#### Internet Inspection Request from: Bob Thornton On site visit to verify stair test compliance with structural inspector.
FIR05-00594 INSP-Sprinkler Rough-in/Hydro3/28/20063/29/20063/29/2006 3:15:27 PMPPART
Hydrostatic test of the overhead wet, antifreeze, and standpipe systems is satisfactory, noted one head at the mezzanine stair landing is painted, head cage is missing at head under mezz ductwork, inspected the 5th and 6th floors for cover, the mech penthouse, 11th floor, and portions of the 1st floor are not inspected for cover at this time, discussed items left for completion at the riser room and final testing including standpipe flow test, forward flow of BFP and related sprinkler alarms.
FIR05-00297 INSP-Sprinkler Rough-in/Hydro3/28/20063/29/20063/29/2006 1:52:38 PMAFAIL
Flexible couplings are required on the 4" riser main above and below each floor penetration as the min. seismic clearance is not provided at these locations, the min. separation for heads at the east corner of each floor is exceeded.
FIR05-00372 INSP-Final Inspection3/28/20063/29/20063/29/2006 12:57:51 PMAPASS
Items on previous correction notices have been completed, fire sprinkler permit finaled.
MIS05-00093 FIR-Final3/28/20063/29/20063/29/2006 11:37:04 AMAPASS
Items on correction notice have been completed, inspection passed.
FIR06-00128 INSP-Sprinkler Rough-in/Hydro3/28/20063/29/20063/29/2006 11:20:48 AMAPART
UG fire supply line is good for cover, the target window on the post indicator shall be aligned parallel to the underground pipe per review notes and requirements of IFC 2003.
FIR06-00173 INSP-Sprinkler Rough-in/Hydro3/29/20063/29/20063/29/2006 10:38:56 AMAPASS
Overhead fire sprinkler work passed inspection, missing ceiling tiles at three locations to be installed today.
FIR06-00124 INSP-Final Inspection3/28/20063/29/20063/29/2006 9:00:40 AMAPASS
Fire alarm work is satisfactory, fire alarm passed inspection.
FIR05-00174 INSP-Final Inspection3/28/20063/29/20063/29/2006 12:00:00 AMPCANC
Kenny; Phone #: ###-#### Internet Inspection Request from: Elizabeth Esong /// Cancel per Kenny (Treasure Valley Fire Protection) and reschedule for 3-30 AM 3-29-06 eus