Inspections for the day of: Monday, March 29, 2010.
Number of inspections: 9
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR02-00413 FIR-Aging Inspection3/29/20103/29/20103/30/2010 5:42:06 PM DONE
Final scheduled.
FIR09-00536 INSP-Sprinkler Rough-in/Hydro3/29/20103/29/20103/29/2010 4:46:34 PMPPART
Todd Phone #: 941- 6014
FIR08-00764 INSP-Conference3/29/20103/29/20103/29/2010 4:45:41 PMPDONE
Regarding activity notes 12/17/08.
FIR10-00042 INSP-Final Inspection3/29/20103/29/20103/29/2010 4:43:39 PMPPASS
C/N items finished, fire sprinkler permit final approved.
FIR10-00122 INSP-Sprinkler Rough-in3/29/20103/29/20103/29/2010 3:57:00 PMPPART
Overhead modifications at the remodel area per the scope of work are approved for cover, final pending missing ceiling tile install.
FIR10-00011 INSP-Sprinkler Rough-in3/29/20103/29/20103/29/2010 3:54:23 PMPPART
Replaced heads at second floor okayed, discussed non-combustible insulation fill to meet exception allowed per NFPA 13 at the concealed space 1st floor.
BLD09-01336 FIRE-Conference3/29/20103/29/20103/29/2010 3:13:45 PMADONE
Ref. activity notes 3/26
BLD09-01218 FIRE-Final Inspection3/29/20103/29/20103/29/2010 3:11:40 PMANR
Project is not in condition for final fire life safety at this time. Discussed general requirements with the owner including door hardware, building address, exit signs, location of fire extinguishers to be posted, and the new med gas closet (N2 and 02 only).
FIR04-00803 INSP-Final Inspection3/29/20103/29/20103/29/2010 3:06:16 PMAPASS
Permit final okayed- see also activity notes completed 1/10/05 and project related building permit notes.