FIR09-00708
| INSP-Sprinkler Rough-in | 3/29/2010 | 3/29/2010 | 3/29/2010 3:29:13 PM | P | PASS |
|
|
The riser room and the adjacent electrical room are ok to cover.
|
BLD08-00973
| FIRE-Final Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 2:34:09 PM | P | FAIL |
|
|
Mike Jordan and I met with Bree at the business and discussed the outstanding issues which are providing verification of the annual inspection for the fire sprinkler system and providing compliant hardware on the west/rear exit door.
|
FIR10-00018
| INSP-Sprinkler Rough-in/Hydro | 3/29/2010 | 3/29/2010 | 3/29/2010 2:31:12 PM | P | PASS |
|
|
Sprinkler rough-in passed. The office areas on the south side of the building are ok for ceiling installation by this inspector. The office areas on the west end are not finished. I noted many heads that are still covered with tin foil to protect from painting. Resubmittals are required due to piping changes as marked in red on the city approved plans (riser nipples in the storage remote area are the biggest issue).
|
FIR09-00566
| INSP-Sprinkler Rough-in | 3/26/2010 | 3/29/2010 | 3/29/2010 2:27:08 PM | P | PASS |
|
|
Permit finaled.
|
FIR10-00018
| INSP-Final Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 2:26:13 PM | P | FAIL |
|
|
Project is not ready for a final inspection. A rough-in inspection has been set up.
|
BLD09-00945
| FIRE-Final Inspection | 3/26/2010 | 3/29/2010 | 3/29/2010 2:24:43 PM | A | CANC |
|
|
chauntel hyde Phone #: ###-#### Wrong permit number and project set up for inspection.
|
BLD10-00557
| FIRE-Final Inspection | 3/29/2010 | 3/29/2010 | 3/29/2010 2:24:05 PM | P | FAIL |
|
|
Provide all of the corrections and requirements as marked in red on the city approved plans. They include an additional fire extinguisher near the rear/west end of the tenant space, providing the additional exit sign and emergency light as located on the plans, provide dedicated egress marked path as shown on the plans and test exit signs and emergency lighting.
|