MIS10-00112
| BLD-Conference | 3/28/2011 | 3/29/2011 | 3/29/2011 4:52:39 PM | A | DONE |
|
|
Ron=Please call prior to inpection Phone #: ###-#### Final OK........
|
MIS10-00112
| DOC - Permit Finaled | 3/29/2011 | 3/29/2011 | 3/29/2011 4:52:02 PM | P | PASS |
|
|
|
MIS10-00084
| BLD-Final | 3/28/2011 | 3/29/2011 | 3/29/2011 3:51:12 PM | A | DONE |
|
|
Expired.
|
MIS10-00084
| DOC - Permit Expired | 3/29/2011 | 3/29/2011 | 3/29/2011 3:49:20 PM | P | PASS |
|
|
To the best of my knowledge, We were trying to determine if they even needed a permit or not since they were not changing anything stucturally.....Just tile and plumbing. So I'm going to Expire.
|
BLD10-02898
| BLD-Framing/Rough-in | 3/29/2011 | 3/29/2011 | 3/29/2011 3:40:34 PM | P | FAIL |
|
|
Phone #: ###-#### >> Inspection requested via web by Tony Luchini C/N.......Lat. truss brace, strapping, diagonal brace top of glue lam beam.
|