FIR11-00087
| INSP-Final Inspection | 3/25/2011 | 3/29/2011 | 3/29/2011 3:55:40 PM | P | PART |
|
|
Fire alarm testing completed. Items needed for final include powered dampers at the third floor to verify operation, repair existing notification device at the 2nd floor comm. room, relocate MPat the main entry vestibule 1st floor, replace/add horns at the basement mechanical room, provide signage at the door to the FACP room per review note #21.
|
BLD10-01739
| FIRE-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 3:29:19 PM | P | PART |
|
|
Fire alarm permit FIR11-00134 issued 3/24 for scope of changes to the existing system due to remodel work.
|
FIR11-00042
| INSP-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 3:23:58 PM | P | PASS |
|
|
Fire sprinkler permit final approved.
|
FIR11-00135
| INSP-Sprinkler Rough-in/Hydro | 3/25/2011 | 3/29/2011 | 3/29/2011 3:23:00 PM | A | PART |
|
|
Overhead work is okay for cover. Need to provide area separation at the new head in the electrical/comm. closet as discussed.
|
FIR10-00497
| INSP-Supply line flush | 3/29/2011 | 3/29/2011 | 3/29/2011 3:19:53 PM | A | PART |
|
|
UG fire supply line flush completed- see activity notes dated 3/25 for project related OH permit work FIR10-00569.
|
BLD11-00298
| FIRE-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 3:15:02 PM | P | NR |
|
|
|
BLD11-00523
| FIRE-Conference | 3/29/2011 | 3/29/2011 | 3/29/2011 3:14:29 PM | A | DONE |
|
|
Regarding correction notice items.
|