FIR10-00072
| FIR-Aging Inspection | 3/29/2011 | 3/29/2011 | 3/30/2011 2:50:07 PM | | PASS |
|
|
|
FIR11-00014
| INSP-Sprinkler Rough-in | 3/29/2011 | 3/29/2011 | 3/29/2011 3:32:24 PM | P | CANC |
|
|
Wrong inspection type was called in. This was actually for alarm testing.
|
FIR11-00014
| INSP-Alarm Testing | 3/29/2011 | 3/29/2011 | 3/29/2011 3:30:30 PM | P | DONE |
|
|
The phase II fire alarm testing is complete. An item noted was any general smoke detector alarm would recall the elevator which is not allowed. I agreed to "sign off" for this phase II work but the elevator recall will need to be addressed prior to a final sign off on this project.
|
FIR11-00073
| INSP-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 3:22:50 PM | P | PASS |
|
|
permit finaled
|
FIR10-00428
| FIR-Aging Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 2:35:23 PM | | NR |
|
|
Per Brian with Simplex, Charlie is working on getting the elevators done.
|
FIR10-00542
| FIR-Aging Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 2:29:35 PM | | NR |
|
|
work is in progress
|
BLD09-00414
| FIRE-Final Inspection | 3/29/2011 | 3/29/2011 | 3/29/2011 2:28:52 PM | P | PASS |
|
|
life safety passed
|
FIR11-00094
| INSP-Sprinkler Rough-in | 3/29/2011 | 3/29/2011 | 3/29/2011 2:27:47 PM | P | PASS |
|
|
sprinkler piping is ok to cover.
|
FIR10-00470
| INSP-Sprinkler Rough-in/Hydro | 3/28/2011 | 3/29/2011 | 3/29/2011 2:26:24 PM | P | PASS |
|
|
hydro for second floor passed.
|
BLD11-00381
| FIRE-Final Inspection | 3/28/2011 | 3/29/2011 | 3/29/2011 9:38:22 AM | A | FAIL |
|
|
Provide final inspection for the open FIR permit relating to the AES panel. Provide passage hardware to the restroom area and provide a ceiling in the small closet to act as a heat trap for the pendant sprinkler head.
|