Inspections for the day of: Thursday, March 29, 2012.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD12-00197 FIRE-Final Inspection3/27/20123/29/20123/30/2012 10:49:25 AMPFAIL
Project is not ready for fire life safety final due to several items. Project related fire sprinkler and alarm permits need finaled, noted missing hardware at the main entry/exit, need to mount fire extinguishers, post max. occupant load sign, missing ceiling tile, no access at some areas due to floor finishes underway. Building lacks heat at the lower level- unit heaters are missing. Remote annunciator for the fire alarm control panel does not meet location criteria per title 7 section 510.2.
FIR12-00155 INSP-Sprinkler Rough-in3/29/20123/29/20123/30/2012 10:40:25 AMPNR
JEREMY Phone #: ###-#### *Note- no access to complete inspection due to jobsite conditions (floor sealant).
FIR11-00365 INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012 10:38:32 AMAFAIL
System 8 hydrostatic test failed due to pressure loss at the gauge.
FIR12-00045 INSP-Sprinkler Rough-in3/28/20123/29/20123/30/2012 10:36:13 AMAPART
Previous correction items completed. Rough-in passed.
FIR11-00524 INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012 10:33:22 AMAPART
System 4 overhead hydrostatic test passed. Completed re-inspection for relocated and added pendent heads at the AMH track areas. Noted missing hangers on three new arm-overs >2'.
FIR11-00448 INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012 10:27:37 AMAFAIL
Overhead hydrostatic test failed due to pressure loss at the gauge. Noted re-inspection items include; plan resubmittal required due to: 18 additional upright heads not shown on the original design or included in the calculations, added 45's and 90's at the 4" grid mains, 2 1/2" main has been changed to 3", column protection is not included, missing longitudinal brace at mech. room 44, secure two retainers, upright coverage at the north mechanical access area is overspaced at 140ft2. Previous corrections finished are; sprig height at beams, axis adjustment, spacing at mechanical access 47 and south mech. access.
FIR11-00431 INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012 7:17:33 AMAFAIL
Overhead hydrostatic test failed due to visible leakage on the system and pressure loss at the gauge. Re-inspection items noted include; lacking coverage at vestibule 100P- temporary bootie room (missing ceiling and sprinkler heads, outlets are plugged), SW stair 100W exit landing is partially sprinklered, missing field ceiling tile at the TEM labs, leak at non-clean link 100A, construction at the closet adjacent to RR 100F is incomplete, NW stair landing is partially sprinklered, missing ceiling and sprinkler coverage at non-clean link room 100T, missing ceiling tile at non-clean link, heads not installed at column line K temporary wall NE exit, missing head and ceiling at link intersections, secure retainer at dock corridor, noted 5 added uprights not shown on plans below dock area ductwork, plugged outlet and missing ceiling at GR 100H.
FIR11-00301 INSP-Sprinkler Rough-in/Hydro3/28/20123/29/20123/30/2012 6:58:51 AMAFAIL
Overhead hydrostatic test failed due to pressure loss at the gauge.