Inspections for the day of: Friday, March 29, 2013.
Number of inspections: 14
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorForrest France
TitleFIRE INSPECTOR
Phone #794-1981
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
FIR12-00634 INSP-Sprinkler Rough-in/Hydro3/27/20133/29/20133/29/2013 5:47:41 PMPPART
For OH hydrostatic test up to the 10th floor.
FIR12-00681 INSP-Sprinkler Rough-in/Hydro3/27/20133/29/20133/29/2013 5:45:36 PMPPART
For overhead hydrostatic testing of the header and supply piping.
FIR13-00011 INSP-Sprinkler Rough-in/Hydro3/27/20133/29/20133/29/2013 5:42:53 PMPPART
OH hydrostatic test of the 3rd, 4th, and 5th floor dry systems completed satisfactory. Also finished hydrostatic tests of shell system work at the 6th -10th floor levels.
FIR12-00723 INSP-Sprinkler Rough-in/Hydro3/27/20133/29/20133/29/2013 5:36:26 PMPPART
2nd floor hydrostatic test of the shell fire protection system passed.
FIR12-00721 INSP-Sprinkler Rough-in/Hydro3/27/20133/29/20133/29/2013 5:34:33 PMPPART
1st floor shell protection hydrostatic test passed.
BLD13-00690 FIRE-Final Inspection3/28/20133/29/20133/29/2013 5:24:42 PMPPASS
Life safety inspection completed. Batteries at the exit signs and lever action hardware to be provided at both the main entry and back exit doors as discussed- to be finished and verified for completion prior to structural final as agreed.
FIR12-00693 INSP-Sprinkler Rough-in3/29/20133/29/20133/29/2013 5:19:48 PMPDEFR
lonnie Phone #: ###-#### *Incorrect permit number requested for inspection
FIR12-00574 INSP-Sprinkler Rough-in/Hydro3/29/20133/29/20133/29/2013 5:17:10 PMPPART
Overhead hydrostatic testing of the new dry system, 6" riser, and FDC completed satisfactory.
FIR13-00046 INSP-Final Inspection3/28/20133/29/20133/29/2013 12:31:13 PMANR
josh Phone #: ###-#### * Pending trade related contractor
FIR13-00114 INSP-Sprinkler Rough-in3/28/20133/29/20133/29/2013 12:29:45 PMAPART
Overhead work at the new conference room okayed for ceiling cover. Coverage adjustments will also be necessary at an additional new room per the scope of remodel. Plan modification needed.
FIR12-00670 INSP-Sprinkler Rough-in/Hydro3/28/20133/29/20133/29/2013 12:25:05 PMANR
Robert is the contact. Thanks Phone #: ###-#### >> Inspection requested via web by Stan Beus
FIR13-00136 INSP-Final Inspection3/26/20133/29/20133/29/2013 12:23:42 PMAPART
Overhead fire sprinkler modifications are approved for cover.
FIR13-00078 INSP-Final Inspection3/27/20133/29/20133/28/2013 6:25:32 PMACANC
Let me know what time works for you. Thanks -Jason Gordon ###-#### Phone #: ###-#### >> Inspection requested via web by neal Timmerman Inspection cancelled from web by: neal Timmerman
BLD12-03173 FIRE-Final Inspection3/27/20133/29/20133/28/2013 2:43:36 PMACANC
Life safety Phone #: ###-#### >> Inspection requested via web by Frederick Sand Inspection cancelled from web by: Frederick Sand