PLM16-01100
| Water Heater Final | 3/28/2016 | 3/29/2016 | 3/29/2016 2:45:05 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Sean Hyten >wh, co-d, ok
|
PLM16-01099
| Final | 3/28/2016 | 3/29/2016 | 3/29/2016 2:42:12 PM | P | PASS |
|
|
Phone #: ###-#### Inspection requested via web by Mary LaFayette >wh, co, ok
|
PLM16-01057
| Plumbing Rough-in | 3/29/2016 | 3/29/2016 | 3/29/2016 2:42:01 PM | P | PASS |
|
|
>water only ok. >BLD permit was issued and grouped >plumbing permit needs to be adjusted to reflect fixtures by final.
|
PLM16-00871
| Plumbing Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 2:25:26 PM | A | FAIL |
|
|
key is on top of electric box Phone #: ###-#### Inspection requested via web by Tobi Wilson >Mst sh, lav and softener drain need to tie onto 3" stack instead of basement tub vent.. >basement lav, washerbox and sink need to tie into a drain instead of vent from floor drain.
|
PLM15-03526
| Final | 3/29/2016 | 3/29/2016 | 3/29/2016 1:58:12 PM | P | FAIL |
|
|
plumbing final. Note* No dishwasher. It is to be installed by owner at a later date. Doors on water heater are not our responsibility; to be done by builder. Phone #: ###-#### Inspection requested via web by Chris Field >plug off disposal drain for dishwasher >cannot final until combustion air is supplied for water heater. I talked to Paul and he is contacting Mech contractor to fix.
|
PLM16-01111
| Sprinkler (Final) | 3/29/2016 | 3/29/2016 | 3/29/2016 1:07:40 PM | P | PART |
|
|
Phone #: ###-#### Inspection requested via web by Darrell Roark >need to certify PVB. Eric its under the pine tree. >ok to backfill
|
PLM16-01113
| Final | 3/29/2016 | 3/29/2016 | 3/29/2016 12:36:32 PM | P | PASS |
|
|
fixture replacement of sink only, ready and open Inspection requested via web by david colburn
|
PLM16-00303
| Water and/or Sewer | 3/25/2016 | 3/29/2016 | 3/29/2016 10:55:01 AM | A | PART |
|
|
Daryl Phone #: ###-#### >section of 4" PE up to tank ok to cover >leaving open at tank to see valve once installed
|
PLM16-01103
| DOC - Permit Finaled | 3/29/2016 | 3/29/2016 | 3/29/2016 9:34:26 AM | P | PASS |
|
|
|
PLM16-01103
| Water and/or Sewer | 3/28/2016 | 3/29/2016 | 3/29/2016 9:33:32 AM | A | PASS |
|
|
sewer only; Hamed Phone #: ###-#### >new sewer ok
|
PLM16-01057
| Plumbing Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 9:20:20 AM | A | PEND |
|
|
INSPECTION FOR JUST THE WATER LINES. NOT THE DRAINS AT THIS TIME. Phone #: ###-#### Inspection requested via web by Chris Field >h/o may need building permit for remodel, he is going to check into it.
|
PLM16-01036
| Final | 3/25/2016 | 3/29/2016 | 3/29/2016 8:59:25 AM | A | PASS |
|
|
Please call homeowner, Tim Morgan at ###-#### about 30 - 60 minutes prior to inspection. Phone #: ###-#### Inspection requested via web by Mary LaFayette >wh c/o ok
|
PLM16-01074
| Final | 3/28/2016 | 3/29/2016 | 3/29/2016 8:46:25 AM | A | FAIL |
|
|
Please call homeowner at ###-#### prior to arrival. Phone #: ###-#### Inspection requested via web by Maira Guzman >AAV not approved for outside, >need cleanout
|