BLD15-01489
| FIRE-Final Inspection | 3/28/2016 | 3/29/2016 | 3/29/2016 2:17:43 PM | A | PASS |
|
|
Life safety passed. Builder will need the indicator installed and the correct sticker installed at the main exit prior to a building inspection.
|
FIR15-00822
| INSP-Sprinkler Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 1:27:27 PM | P | PART |
|
|
See the city approved plans for locations where the sprinkler piping can be covered above the hardlids. Also plan modifications will again be required due to additional fittings and an elevation change that has not been included on the latest plans. The elevation change and the additional fittings will effect the hydraulic calculations and will need to be verified through the plan review process. Also at several locations where the piping passes through CMU walls and rises up through the floor the hole size is not large enough to meet NFPA 13. The holes will need to be larger or flexible couplings will need to be utilized as per NFPA 13. For the most part the sprinkler rough-in is passed except for the items noted above. I will need verification that the wood used in several locations is fire treaded or upright protection will be required.
|
FIR12-00307
| INSP-Final Inspection | 3/28/2016 | 3/29/2016 | 3/29/2016 12:21:02 PM | P | CANC |
|
|
Rescheduled for tomorrow
|
FIR16-00165
| INSP-Final Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 8:28:49 AM | P | PASS |
|
|
Permit finaled
|
FIR16-00165
| INSP-Sprinkler Rough-in | 3/29/2016 | 3/29/2016 | 3/29/2016 8:27:51 AM | P | PASS |
|
|
Rough-in passed
|
FIR16-00143
| INSP-Sprinkler Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 7:35:58 AM | A | PASS |
|
|
The two pendant heads located in the soffit are ok to cover.
|
BLD15-04138
| FIRE-Final Inspection | 3/28/2016 | 3/29/2016 | 3/29/2016 7:28:39 AM | A | PASS |
|
|
life safety passed. Wall has been completed.
|
BLD15-04138
| FIRE-Final Inspection | 3/28/2016 | 3/29/2016 | 3/29/2016 12:00:00 AM | P | CANC |
|
|
Miles Phone #: ###-####
|