BLD16-00974
| FIRE-Final Inspection | 3/29/2016 | 3/29/2016 | 3/29/2016 12:51:39 PM | P | PASS |
|
|
No fire sprinklers, no fire alarms, life fire safety inspection passed/complete
|
FIR16-00129
| INSP-Sprinkler Rough-in | 3/29/2016 | 3/29/2016 | 3/29/2016 10:44:41 AM | P | PART |
|
|
Rough to cover inspection performed on soffit hardlids, soffit hardlids approved for cover.
|
FIR15-00748
| INSP-Sprinkler Rough-in | 3/28/2016 | 3/29/2016 | 3/29/2016 9:03:13 AM | A | FAIL |
|
|
3rd level piping not approved for cover, some area's have exposed piping in the attic area with no insulation tenting cover. Main fire sprinkler feed for the third level is wrapped with insulation, piping needs to have clear pocket between sheetrock and piping to help prevent freezing. Notified general contractor of issues, 3rd level east side will need to be inspected again to verify corrections before cover can be approved.
|