ELE17-00496
| Electrical Rough-In | 3/28/2017 | 3/29/2017 | 3/29/2017 1:00:01 PM | P | CANC |
|
|
This area of the job is completely finished so we need to get an occupancy in this area so we demo the 2nd area that is also part of this job. Please call Lynn at ###-#### prior to inspection for more detail. Phone #: ###-#### Inspection requested via web by Lynn Proctor Needed partial final
|
ELE17-00496
| Final | 3/29/2017 | 3/29/2017 | 3/29/2017 12:59:51 PM | P | PART |
|
|
This area of the job is completely finished so we need to get an occupancy in this area so we demo the 2nd area that is also part of this job. Please call Lynn at ###-#### prior to inspection for more detail. Phone #: ###-#### Inspection requested via web by Lynn Proctor Unit 200 only ok to occupy and move in.
|
ELE17-00585
| Electrical Rough-In | 3/28/2017 | 3/29/2017 | 3/29/2017 12:40:28 PM | P | PASS |
|
|
Central Interior wall inspection for cover. Contact Scott Boden Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek Remaining interioir walls and bath hard lids and walls ok cover
|
ELE16-02693
| Electrical Rough-In | 3/29/2017 | 3/29/2017 | 3/29/2017 11:39:35 AM | A | CANC |
|
|
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Needed partial final
|
ELE16-02693
| Final | 3/29/2017 | 3/29/2017 | 3/29/2017 11:39:22 AM | P | PART |
|
|
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo Phase 2 areas ok to occupy, WIll need Toby with Mountain power to final his permit on lighting accross walkway for Final
|
ELE16-02784
| Conference | 3/28/2017 | 3/29/2017 | 3/29/2017 10:39:03 AM | A | DONE |
|
|
Call Scott ###-#### Discussed wiring outlet placement branch circuit and panels and all receptacle requirements arc fault protection, tamper receptacles,GFCI , weather res,spark rings, in-use covers,grounding and seperating grounded and grounding conductors, protection of nm cable.
|
ELE17-00839
| Electrical Rough-In | 3/28/2017 | 3/29/2017 | 3/29/2017 9:40:53 AM | A | PART |
|
|
Phone #: ###-#### Inspection requested via web by Kerri Hamilton u/g in building and grounding electrode ok cover
|
ELE16-01134
| Conference | 3/28/2017 | 3/29/2017 | 3/29/2017 8:34:56 AM | A | PASS |
|
|
Bobby ###-#### 8th floor west end walls only ok cover
|