Inspections for the day of: Wednesday, March 29, 2017.
Number of inspections: 8
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorEric Story
TitleELE-INSPECTOR
Phone #985-3493
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
ELE17-00496 Electrical Rough-In3/28/20173/29/20173/29/2017 1:00:01 PMPCANC
This area of the job is completely finished so we need to get an occupancy in this area so we demo the 2nd area that is also part of this job. Please call Lynn at ###-#### prior to inspection for more detail. Phone #: ###-#### Inspection requested via web by Lynn Proctor
Needed partial final
ELE17-00496 Final3/29/20173/29/20173/29/2017 12:59:51 PMPPART
This area of the job is completely finished so we need to get an occupancy in this area so we demo the 2nd area that is also part of this job. Please call Lynn at ###-#### prior to inspection for more detail. Phone #: ###-#### Inspection requested via web by Lynn Proctor
Unit 200 only ok to occupy and move in.
ELE17-00585 Electrical Rough-In3/28/20173/29/20173/29/2017 12:40:28 PMPPASS
Central Interior wall inspection for cover.
Contact Scott Boden
Thank you Phone #: ###-#### Inspection requested via web by Cathy Duchek
Remaining interioir walls and bath hard lids and walls ok cover
ELE16-02693 Electrical Rough-In3/29/20173/29/20173/29/2017 11:39:35 AMACANC
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Needed partial final
ELE16-02693 Final3/29/20173/29/20173/29/2017 11:39:22 AMPPART
Need to have an inspector''s signature in the project progress log for verification of yesterday''s TCO approval in phase 2 areas. Please shoot for around 10am so that ESI can ensure their log book will be available, thanks. Phone #: ###-#### Inspection requested via web by Rafael Castillo
Phase 2 areas ok to occupy, WIll need Toby with Mountain power to final his permit on lighting accross walkway for Final
ELE16-02784 Conference3/28/20173/29/20173/29/2017 10:39:03 AMADONE
Call Scott ###-####
Discussed wiring outlet placement branch circuit and panels and all receptacle requirements arc fault protection, tamper receptacles,GFCI , weather res,spark rings, in-use covers,grounding and seperating grounded and grounding conductors, protection of nm cable.
ELE17-00839 Electrical Rough-In3/28/20173/29/20173/29/2017 9:40:53 AMAPART
Phone #: ###-#### Inspection requested via web by Kerri Hamilton
u/g in building and grounding electrode ok cover
ELE16-01134 Conference3/28/20173/29/20173/29/2017 8:34:56 AMAPASS
Bobby ###-####
8th floor west end walls only ok cover