Inspections for the day of: Thursday, March 29, 2018.
Number of inspections: 17
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorTroy Cobbley
TitleFIRE INSPECTOR
Phone #794-9483
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
GRD16-00084 GRD-Final3/29/20183/29/20183/30/2018 3:05:59 PMPPASS
Life safety passed. The fire dept is going to address the bollards at the fire hydrants and the gate width/access issues per Assistant Chief Ron.

Phone #: ###-#### Inspection requested via web by Chris Palmer
GRD16-00084 FIRE-Final Inspection3/29/20183/29/20183/30/2018 12:00:00 AMPPASS
Life safety passed. The fire dept is going to address the bollards at the fire hydrants and the gate width/access issues per Assistant Chief Ron.

Phone #: ###-#### Inspection requested via web by Chris Palmer
FIR18-00218 INSP-Final Inspection3/28/20183/29/20183/29/2018 3:25:11 PMPFAIL
No testing performed due to a stop work order having been placed on the project. Also the appliances do not meet the 6" rule in the IMC. Owner spoke about placing a metal panel behind the hood but I told him that would have to be approved by the mechanical and building inspectors.

Phone #: ###-#### Inspection requested via web by Don Kartchner
BLD16-04428 FIRE-Final Inspection3/29/20183/29/20183/29/2018 2:28:33 PMPCANC
To be rescheduled.

Phone #: ###-#### Inspection requested via web by Chris Palmer
FIR17-00309 INSP-Sprinkler Rough-in/Hydro3/28/20183/29/20183/29/2018 2:28:29 PMPCANC
To be rescheduled.

Todd Ketterling is the contact for this Hydro. Thank you. Phone #: ###-#### Inspection requested via web by Stan Beus Inspection cancelled from web by: Stan Beus
FIR16-00708 INSP-Final Inspection3/28/20183/29/20183/29/2018 2:21:44 PMPDONE
Today I did a walk thru of the second floor. See the city approved plans for sheet signed and dated and with corrections noted in red. The corrections noted are not an absolute list of all items that may need attention. The contractor shall verify that system installation will meet minimum code compliance. The walk thru over the last couple of days did not include the actual testing of any devices. Plan modifications and corrections made in the field will be needed prior to testing of devices.

Nick Tank, inspecting technician Phone #: ###-#### Inspection requested via web by Rose Peterson
BLD17-04567 FIRE-Final Inspection3/29/20183/29/20183/29/2018 1:39:47 PMPPASS
life safety passed
BLD16-04271 FIRE-Final Inspection3/28/20183/29/20183/29/2018 12:27:58 PMPPASS
As per activity notes, no inspection required, hydrants and fire dept access under the associated Grading permit

Phone #: ###-#### Inspection requested via web by Chris Palmer
GRD16-00084 FIRE-Final Inspection3/28/20183/29/20183/29/2018 11:13:06 AMPPASS
Life safety passed
FIR18-00049 INSP-Final Inspection3/29/20183/29/20183/29/2018 9:40:38 AMAPASS
Permit finaled
FIR18-00198 INSP-Final Inspection3/29/20183/29/20183/29/2018 9:40:19 AMAPASS
permit finaled

Call Anthony before heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00197 INSP-Final Inspection3/29/20183/29/20183/29/2018 9:39:58 AMAPASS
permit finaled

Call Anthony when heading out, thanks! Phone #: ###-#### Inspection requested via web by Anthony Minichiello
FIR18-00229 INSP-Sprinkler Rough-in3/29/20183/29/20183/29/2018 9:11:08 AMAPASS
Rough-in passed. All pipingdu can be covered
BLD18-00576 FIRE-Final Inspection3/28/20183/29/20183/29/2018 8:52:38 AMAPASS
life safety passed

Please call Sid ###-#### Phone #: ###-#### Inspection requested via web by Carissa Primmer
BLD18-00575 FIRE-Final Inspection3/28/20183/29/20183/29/2018 8:50:58 AMAPASS
life safety passed


Please call Sid ###-####. Phone #: ###-#### Inspection requested via web by Carissa Primmer
FIR18-00123 INSP-Final Inspection3/28/20183/29/20183/29/2018 8:03:52 AMAPASS
permit finaled
BLD17-04539 FIRE-Final Inspection3/28/20183/29/20183/29/2018 7:36:38 AMAPASS
Life safety passed