Inspections for the day of: Friday, March 29, 2019.
Number of inspections: 20
Percentage of inspections complete: 100 %
Percentage of inspections not complete: 0 %
Contact Information
InspectorBrandon Shaw
TitleBLD-COM/RES INSPECTOR
Phone #208-954-9358
Permit NumberDescriptionReceivedRequestedCompletedAM/PMDisposition 
BLD19-00739 BLD-Final3/28/20193/29/20193/29/2019 5:08:06 PMPFAIL
Failed Fire and Life...
BLD18-02945 BLD-Final3/28/20193/29/20193/29/2019 5:07:01 PMPPEND
Install smoke alarms per R314.3 and interconnected per R314.4...
Install Carbon monoxide per R315.3...
BLD18-04433 BLD-Footing3/28/20193/29/20193/29/2019 4:56:23 PMPPASS
We would like an afternoon inspection on the rebar ; WWF for the Outdoor Kitchen slab, turn down sidewalk and column footings.

James T. Thomas
###-#### Phone #: ###-#### Inspection requested via web by James Thomas
BLD18-04433 BLD-Energy code compliance3/28/20193/29/20193/29/2019 4:56:15 PMPPASS
We would like a PM inspection for the closed cell foam insulation installation at the Indoor Kitchen Expansion: floor joists, walls, ceiling, etc. The drywall team would like to hang on Saturday morning in this area.

Regards,

James T. Thomas
###-#### Phone #: ###-#### Inspection requested via web by James Thomas
BLD19-00412 BLD-Wall Bracing3/29/20193/29/20193/29/2019 4:55:58 PMPPART
Work in progress...
Exterior only...
Interior shear to be installed before framing rough-in...
BLD19-00305 BLD-Foundation3/28/20193/29/20193/29/2019 2:27:07 PMAPASS
No change in location, footing and foundation are ok to pour, with no new Geo soil subgrade, per phone call with Melissa Jannusch
BLD19-00875 BLD-Final3/29/20193/29/20193/29/2019 1:26:12 PMPPASS
Final Inspection requested via web by Joshua Adams
BLD19-00875 DOC - Permit Finaled3/29/20193/29/20193/29/2019 1:26:04 PMPPASS
BLD18-04456 BLD-Footing3/28/20193/29/20193/29/2019 1:10:38 PMPPASS
Work in progress...
BLD19-00635 BLD-Conference3/29/20193/29/20193/29/2019 1:02:30 PMPPASS
Footing...
Ok to pour...
BLD19-00768 BLD-Footing3/28/20193/29/20193/29/2019 11:49:34 AMAPASS
Phone #: ###-#### Inspection requested via web by Sabrina McCleve
BLD18-03721 BLD-Energy code compliance3/29/20193/29/20193/29/2019 11:49:20 AMAPASS
BLD18-03721 BLD-Framing/Rough-in3/28/20193/29/20193/29/2019 11:49:03 AMAPASS
Corrections SAT...
BLD18-03722 BLD-Energy code compliance3/29/20193/29/20193/29/2019 11:48:29 AMAPASS
BLD18-03722 BLD-Framing/Rough-in3/28/20193/29/20193/29/2019 11:48:15 AMAPASS
Corrections SAT...
BLD19-00268 BLD-Wall Bracing3/28/20193/29/20193/29/2019 11:47:40 AMAPASS
Phone #: ###-#### Inspection requested via web by Kyle Seick
BLD19-00131 BLD-Footing3/28/20193/29/20193/29/2019 11:47:25 AMAPASS
Work in progress...
BLD18-00552 BLD-Energy code compliance3/25/20193/29/20193/29/2019 11:46:51 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD18-00550 BLD-Framing/Rough-in3/27/20193/29/20193/29/2019 11:46:40 AMAPASS
Phone #: ###-#### Inspection requested via web by Clint Wall
BLD18-03734 BLD-Energy code compliance3/28/20193/29/20193/29/2019 11:46:16 AMAPASS
Phone #: ###-#### Inspection requested via web by Jarrod Nelson